32°28′38″N 91°37′56″W / 32.477149°N 91.632333°W / 32.477149; -91.632333
| Hyperion Data Center | |
|---|---|
Image posted by Zuckerberg showing the construction plan for Hyperion superimposed on Manhattan | |
![]() Interactive map of the Hyperion Data Center area | |
Alternative names |
|
General information | |
| Status | Under construction |
| Location | Holly Ridge, Louisiana, United States |
| Elevation | 0.03 km |
| Year built | 2024–2030 |
| Cost | > $27 Billion USD |
| Owner | Meta Platforms |
| Technical details | |
| Floor area | 4,000,000 ft2 (371,612 m2) |
| Website | |
| datacenters | |
The Richland Parish Data Center, nicknamed "Hyperion", is a planned artificial intelligence data center by Meta Platforms under-construction along Highway La. 183 in Richland Parish, Louisiana, just outside of Holly Ridge. It is one of a number of "titan clusters" being built in preparation for the emergence of AI superintelligence.12 Modern technological researchers disagree as to whether or not superintelligence will ever exist, though Meta CEO Mark Zuckerberg has expressed belief that its creation is inevitable.34 Current plans allot for the investment of $27 billion, as the structure is built from 2025 to 2030.5
History
Meta was considering potential locations for their flagship data center in early 2024. Before being announced later in December, the plan was completely secret; meetings held between involved organisations and even government officials could only refer to it by the codename "Project Sucre" to protect it from potential corporate espionage. The data center was first announced on 04 December 2024, though its full scale was yet to be revealed. At first, Meta would not even claim responsibility for it, channelling all of its investments through the secret shell subsidiary Laidley LLC.67
We set out looking for a place where we could expand into gigawatts pretty quickly, and really get moving within that community on a large plot of land very quickly. We looked at finding very, very large contiguous plots of land that had access to the infrastructure that we need, the energy that we needed, and could move very, very quickly for us.
— Rachel Peterson, Meta Vice President of Data Centers8
The Louisiana-based Entergy Corporation, aiming for the facility to be built in its own backyard, negotiated a deal with the government of Louisiana to provide Meta with enormous tax breaks if they agreed to build Hyperion there. The Louisiana legislature responded by passing Act 730, which provides significant tax rebates on the purchase or lease of equipment for building and operating data centers.9 Meta found the arrangement acceptable, and bought a plot of land from the government. The government also had to further amend its laws to allow Meta to do this, as pre-existing policy forbade purchasing land directly from the government instead of hosting a public auction.10 The plot of land, originally called Franklin Farms, was purchased from the Franklin family in 2006 by the government, intending for it to be developed into an automotive manufacturing plant.11
Greater attention was brought to Hyperion it when Zuckerberg posted about the project on 14 July 2025 on Threads.1213 The project subsequently caught media attention for its large size, as Zuckerberg's post portrayed the structure superimposed over Manhattan (pictured). The construction site spans 2,250 acres (9.1 km2), with a total planned floor area of 4,000,000 square feet (371612 m2) across the campus.14
Meta initially reported the construction cost to be over $10 billion, but in October 2025, it announced a partnership with Blue Owl Capital providing for at least $27 billion.155
Operation
The facility is expected to consume up to 5 gigawatts (GW) of computational power, more electricity than is currently used by the entire State of Louisiana.16 As part of their deal made with Meta, Entergy plans to be able to produce at least 3.8 GW of electricity for the operation.17
Response to the project
Louisiana Governor Jeff Landry thanked Meta for their decision to build Hyperion in Louisiana, stating that it would "create opportunities for Louisiana workers to fill high-paying jobs of the future." and calling it "A New Chapter" for the state.18 The Louisiana Economic Development (LED) state agency further praised the project, citing Meta's estimate that it would create 1,500 jobs. Additionally, Richland Parish Supervisor Joey Evans stated that he was excited about the project.19
As part of their agreement with Meta, Entergy announced their plan to increase electricity production state-wide.2021 They say that this will result in the cost of energy reducing, though Entergy filings revealed in June 2025 that the cost of electricity would rise and be passed onto consumers.222324 Meta also pledged to match all of Hyperion's power consumption with 100% environmentally friendly electricity production. So far, Entergy has begun building three gas-powered combined-cycle power plants and a substationa in response to the project.25262728
Delta Community College announced in response to Hyperion's construction that it would expand its construction and trade programs.29
In January 2025, Business Facilities Magazine selected Hyperion for its annual Deal of the Year Platinum Award for 2024.303132
Much of the initial backlash following Hyperion's announcement centered around the fast-tracked approval of the project by the state government, and scepticism around Meta's various claims (environmental friendliness, 100% renewable energy, local economic stimulation, price reductions).333435 The Sierra Club criticised Meta for gentrifying the surrounding area, and was highly sceptical of their promise to keep it environmentally friendly.3637 Environmental activist group Earthjustice attempted to have a subpoena of Meta approved to determine if they were compliant with environmental protection laws, though they were unsuccessful.38
Many residents of Holy Ridge have been critical of the construction, complaining about the increased construction vehicle traffic and intense gentrification. Another point of contention is Meta's continued reliance on out-of-state contractors in the facility's construction in spite of their previous commitment to "hire as many local folk as [we] possibly can."39 In spite of Entergy's continual denial that the facility's construction will not adversely affect the power grid, numerous electrical outages have been reported since construction began.40
Notes
Notes
- the Smalling Substation, paid for by Meta
References
References
- "Meta to spend hundreds of billions on AI data centres, says Mark Zuckerberg". BBC News. 2025-07-15. Retrieved 2026-01-23.
- Brook, Jack; Sainz, Adrian (2024-12-04). "Meta to build $10 billion AI data center in Louisiana as Elon Musk expands his Tennessee AI facility". AP News. Retrieved 2026-05-27.
- Zuckerberg, Mark (2025-07-30). "Personal Superintelligence". Meta.com. Archived from the original on 2026-05-24. Retrieved 2026-05-29.
- Capps, Kriston (2025-08-24). "Why Meta's Hyperion Data Center Looks Like It's Crushing New York City". CityLabs Design Edition. Bloomberg L.P. Archived from the original on 2025-10-11. Retrieved 2026-05-29.
- "Meta Announces Joint Venture with Funds Managed by Blue Owl Capital to Develop Hyperion Data Center". Meta Investor Relations. 2025-11-21. Retrieved 2026-05-26.
- Keegan, Jon (2025-12-15). "The power play behind Hyperion, Mark Zuckerberg's colossal data center being built in rural Louisiana". Sherwood News. Retrieved 2026-05-28.
- "LAIDLEY LLC". OpenCorporates. Retrieved 2026-05-27.
{{cite web}}: CS1 maint: url-status (link) - Cohn, Scott (2025-06-25). "To land Meta's massive $10 billion data center, Louisiana pulled out all the stops. Will it be worth it?". CNBC. Retrieved 2026-01-23.
- Louisiana Laws RS 47:305.73 B
- Riegel, Stephanie (2025-01-25). "The behind-the-scenes story of how Meta's $10 billion data center came to Louisiana". The Times-Picayune New Orleans Advocate. Retrieved 2026-05-26.
- Lincoln, Sue (2017-07-18). "Whatever Happened To...The Northeast Louisiana Industrial Megasite?". WRKF. Retrieved 2026-05-27.
- Zuckerberg, Mark (2025-07-14). "We're also building Hyperion, which will be able to scale up to 5GW". Threads. Archived from the original on 2026-02-03. Retrieved 2026-02-03.
- Keegan, Jon (2025-01-24). "Zuckerberg: Meta building city-sized AI data center, going on $65 billion spending spree". Sherwood News. Retrieved 2026-05-28.
- Abugov, Josie (2024-11-20). "Tech giant's plan for huge Louisiana facility clears initial hurdle. Concerns raised over power needs". The Times-Picayune New Orleans Advocate. Retrieved 2026-05-27.
- "Meta's Richland Parish Data Center" (PDF). Meta Data Centers. Archived (PDF) from the original on 2026-01-29. Retrieved 2026-02-03.
- Zeff, Maxwell (2025-07-14). "Mark Zuckerberg says Meta is building a 5GW AI data center". TechCrunch. Retrieved 2026-01-23.
- Swaine, Liz (2024-12-04). "Meta AI facility will be 'game changer' for Louisiana as Jeff Landry announces $10B plan". The Shreveport-Bossier City Advocate. Retrieved 2026-05-27.
- Landry, Jeff (2024-10-22). "Louisiana Governor Jeff Landry: Louisiana needs tax reform to avoid a $1.5 billion shortfall and more". The Times-Picayune New Orleans Advocate. Retrieved 2026-05-27.
- "Meta Selects Northeast Louisiana as Site of $10 Billion Artificial Intelligence Optimized Data Center; Governor Jeff Landry Calls Investment 'A New Chapter' for State - LED | Louisiana Economic Development". www.opportunitylouisiana.gov. 2024-12-04. Retrieved 2026-01-23.
- "Entergy Louisiana to power Meta's data center in Richland Parish". Entergy. 2024-12-06. Retrieved 2026-05-26.
- "Meta selects Entergy, Northeast Louisiana as site of $10B data center". Entergy. 2024-12-05. Retrieved 2026-05-26.
- McKendry, Nolan (2025-06-10). "Ratepayers on the hook for $470M in data center infrastructure". The Center Square Louisiana. Franklin News Foundation. Retrieved 2026-05-28.
- "Entergy announces $5B in customer savings delivered by data center agreements; issues "Fair Share Plus" pledge". Entergy. 2026-03-05. Retrieved 2026-05-26.
- "Data center boom will ultimately drive down electricity costs". Entergy. 2025-12-18. Retrieved 2026-05-26.
- "Entergy Louisiana receives LPSC approval for major infrastructure investments to support Meta's data center and improve reliability". Entergy. 2025-08-20. Retrieved 2026-05-26.
- May, Phillip (2025-08-27). "Meta's move to Louisiana: Good for the state, and a big win for Entergy customers". Entergy. Retrieved 2026-05-26.
- "Entergy Louisiana breaks ground on key substation to power data center in Richland Parish". Entergy. 2025-06-30. Retrieved 2026-05-26.
- James, Phoebe (2025-11-04). "Entergy Louisiana and Energy Transfer sign agreement that supports reliable, affordable energy and economic growth in North Louisiana". Entergy. Retrieved 2026-05-26.
- "Louisiana Delta Community College Launches Data Technician Center Training Program". www.ladelta.edu. Retrieved 2026-05-26.
- "2024 Deals Of The Year & Impact Awards". Business Facilities Magazine. 2025-01-27. Retrieved 2026-05-26.
- Swaine, Liz (2025-01-14). "Louisiana tops in the nation with big win on Meta AI center". The Shreveport-Bossier City Advocate. Retrieved 2026-05-26.
- Remrey, Madison (2025-01-08). "Meta's investment in Richland Parish earns Louisiana Business Facilities' highest honor". KNOE News 8. Retrieved 2026-05-26.
- Abraham, Roshan. "Louisiana Hands Meta a Tax Break and Power for Its Biggest Data Center". Wired. ISSN 1059-1028. Retrieved 2026-05-26.
- Guilbeau, Julia; Abugov, Josie (2024-11-22). "What are AI data centers? Here's how the planned Meta facility in Louisiana could work". The Times-Picayune New Orleans Advocate. Retrieved 2026-05-27.
- Muller, Wesley (2025-08-20). "Entergy Louisiana gains regulatory approval for massive Meta power project • Louisiana Illuminator". Louisiana Illuminator. Retrieved 2026-05-28.
- Anderson, Reese (2025-10-30). "In Rural Louisiana, Meta's New Data Center Promises Growth—But at What Cost?". Sierra. Sierra Club Delta. Retrieved 2026-05-26.
- Abugov, Josie (2024-11-19). Riegel, Stephanie (ed.). "Meta, Facebook's parent company, plans to build multi-billion dollar AI data center in Louisiana". The Times-Picayune New Orleans Advocate. Retrieved 2026-05-27.
- Miller, Susan Stevens (2025-07-02). "Re: Application for Approval of Generation and Transmission Resources in Connection with Service to a Single Customer for a Project in North Louisiana, Docket No. U-37425". Counsel for the Alliance for Affordable Energy and Union of Concerned Scientists. Retrieved 2026-05-26 – via Lpscpubvalence.lpsc.louisiana.gov.
- Goldman, Sharon (2026-03-26). "Meta's $27 billion AI data center is causing chaos in small town Louisiana". Fortune. Retrieved 2026-05-26.
- Hawkins, Drew (2025-11-19). "Construction on Meta's largest data center brings 600% crash spike, chaos to rural Louisiana". Gulf States Newsroom. WWNO. Retrieved 2026-05-29.