Article · Wikipedia archive · Last revised Jun 15, 2026

Exploration Upper Stage

The Exploration Upper Stage (EUS) was a planned rocket stage for NASA's Space Launch System (SLS) during 2013 to 2026. It was intended for use on the proposed SLS Block 1B and Block 2 configurations, replacing the Interim Cryogenic Propulsion Stage (ICPS) used on the Block 1 variant. The EUS was designed to be powered by four RL10C-3 engines burning liquid oxygen and liquid hydrogen, producing a combined thrust of 433.1 kN (97,360 lbf). Although it progressed through a number of design milestones, the stage never entered full-scale hardware production and was ultimately cancelled, before flight. Its first launch had most recently been planned for Artemis IV in 2028.

Last revised
Jun 15, 2026
Read time
≈ 10 min
Length
2,190 w
Citations
53
Source
Exploration Upper Stage
2020 design of the Exploration Upper Stage
ManufacturerBoeing1
Country of originUnited States
Used onSpace Launch System (Block 1B/2)2
General characteristics
Height17.3 m (57 ft)3
Diameter
  • LH2 tank: 8.4 m (28 ft)
  • LOX tank: 5.5 m (18 ft)4
Propellant mass129,000 kg (284,000 lb)
Empty mass14,110 kg (31,110 lb)5
Engine details
Powered by4 × RL10C-33
Maximum thrust433.1 kN (97,360 lbf)
Specific impulse460.1 s (4.512 km/s)6
Burn time1,275 seconds
PropellantLH2 / LOX

The Exploration Upper Stage (EUS) was a planned rocket stage for NASA's Space Launch System (SLS) during 2013 to 2026. It was intended for use on the proposed SLS Block 1B and Block 2 configurations, replacing the Interim Cryogenic Propulsion Stage (ICPS) used on the Block 1 variant. The EUS was designed to be powered by four RL10C-3 engines burning liquid oxygen and liquid hydrogen, producing a combined thrust of 433.1 kN (97,360 lbf). Although it progressed through a number of design milestones, the stage never entered full-scale hardware production and was ultimately cancelled, before flight. Its first launch had most recently been planned for Artemis IV in 2028.

In 2025, the Trump administration proposed terminating the SLS and Orion programs after Artemis III, citing cost concerns. Although the United States Congress subsequently provided funding for Artemis IV and V in the One Big Beautiful Bill Act of July 2025, it directed NASA to study commercial alternatives to the EUS. On February 26, 2026, NASA formally cancelled the Exploration Upper Stage and the Block 1B and Block 2 upgrades, opting instead to continue flights using a standardized Block 1 configuration and pursue alternative upper-stage options, likely an existing commercially developed stage such as ULA's Centaur V.

History

Background

Following the 2010 cancellation of the NASA Constellation Program in February, NASA briefly faced a post‑Shuttle gap with no approved system for human exploration beyond low Earth orbit, prompting both NASA-internal studies and a strong response by the U.S. Congress. The U.S. Senate's NASA Authorization Act of 2010, passed on August 5, 2010, directed NASA to develop a new Shuttle‑derived "Space Launch System" using existing Space Shuttle and Constellation/Ares contracts where possible, and set performance goals of 70–100 tonnes to low Earth orbit initially and at least 130 tonnes in later configurations, as well as a requirement to take the existing Orion space capsule program and extend it to an Orion‑derived Multi‑Purpose Crew Vehicle (MPCV), which was to serve as a backup for commercial crew and cargo to the ISS.7

Even before Constellation's cancellation, NASA had begun assessing alternative heavy‑lift architectures in response to the 2009 Augustine Committee, producing a May 2010 Heavy Lift Launch Vehicle study that compared Shuttle‑derived designs with kerosene‑fueled concepts and favored RS‑25–based cores derived from the Shuttle External Tank. This work fed into the Human Exploration Framework Team (HEFT), which by September 2010 recommended a Shuttle‑derived baseline using an 8.4‑meter‑diameter core with five RS‑25E engines and two five‑segment solid rocket boosters ("5/5"), capable of lifting more than 100 tonnes to low-Earth orbit without an upper stage, while also examining—but not endorsing—an interim "4/3" configuration using four‑segment boosters, three RS‑25 engines, and reused Shuttle SSMEs to launch payloads of up to 70 tonnes.7

After the HEFT study was complete, NASA initiated a requirements analysis cycle where four teams evaluated Shuttle‑derived (hydrolox), kerolox, and modular options, along with cost‑reduction strategies. Team 1 outlined a Shuttle‑derived block evolution culminating in a 130‑tonne‑class vehicle that met the congressional mandate. NASA administrator Charles Bolden ultimately chose to follow the HEFT‑style architecture and skip the "Block 0," minimizing the number of distinct cores and booster types, while Congress added a new requirement for early competition for advanced boosters, with ATK's five‑segment solids used only on initial Block 1 flights. NASA formally announced the Space Launch System on September 14, 2011, establishing Block 1 as the first funded configuration—an 8.4‑meter Shuttle‑derived core using RS‑25D engines and five‑segment solids, paired with an Interim Cryogenic Propulsion Stage (ICPS)—based on the existing 5-meter diameter Delta Cryogenic Second Stage—to support initial uncrewed and crewed missions—and proceeded to award major development contracts, including core‑stage and upper‑stage work led by Boeing.78

Development

The Exploration Upper Stage was an integral part of the evolutionary phased implementation of the NASA Space Launch System (SLS).9 The EUS was conceived to increase performance beyond Block 1 capabilities, particularly for trans-lunar injection of larger payloads.10

The SLS Block 1 configuration, which first flew on Artemis I in 2022, consisted of a core stage powered by four RS-25 engines, two five-segment solid rocket boosters, and the ICPS upper stage.117

Originally named the Dual Use Upper Stage (DUUS pronounced "duce"), the stage was later renamed the Exploration Upper Stage (EUS) due to concerns that DUUS sounded like a profanity in Japanese.1012 In 2014, NASA confirmed development of the SLS Block 1B configuration using the EUS, at that time targeting its debut in 20218 on what was later renamed to Artemis II. A 2014 Boeing presentation named the upper stage as the "Large Upper Stage (LUS)".13

In April 2016, NASA selected a configuration using four RL10-C3 engines,6 and later ordered 10 engines for the program.14 In 2018, NASA decided to optimize the EUS for lunar missions by using smaller tanks.15

By February 2020, delays in the development contract led NASA to plan on using the phase 1 ICPS upper stage for the first three SLS launches, with the first flight of the EUS not planned until Artemis IV in 2028.1617 The stage completed a critical design review in December 2020, clearing it for continued development.18

In March 2022, Boeing explored the use of a carbon composite liquid oxygen tank on the EUS, which could reduce mass by up to 30%.19

On May 2, 2025, the Trump administration released its fiscal year 2026 budget proposal, which called for terminating the SLS and Orion spacecraft programs after Artemis III.2021 The proposal described the SLS program as "grossly expensive" and exceeding its budget, and allocated funding to transition to "more cost-effective commercial systems".22 However, Congress, through the One Big Beautiful Bill Act which Trump signed into law in July 2025, provided $4.1 billion in funding for the SLS units for Artemis IV and V, though it did direct NASA to investigate adopting commercial alternatives to EUS.23

On February 26, 2026, NASA announced the cancellation of the Exploration Upper Stage and the Block 1B and 2 upgrades, opting instead to continue flights using a "standardized" Block 1 configuration, likely using an existing upper stage like ULA's Centaur V.2425 NASA reported that all of the agency's key contractors, including Boeing, were on board with the change, and senior leaders in Congress had been briefed on the proposed changes. In a NASA news release, Boeing appeared to offer at least some support for the revised plans.2426

Funding

SLS upper stage

Between 2013-2016, the upper stage was not given a budget separate to general SLS launch vehicle development.27282930 Between 2017-2020, the upper stage is listed as the "Enhanced Upper Stage (EUS)" in the budget. From 2021-2024, EUS costs are bundled with Block 1B costs and labelled "Block 1B (non-add)" or "Block 1B (non-add) (including EUS)".

Fiscal
year
Nominal
(in millions)
Inflation adjusted
(in millions,
adjusted to 2025)
Listed in budget as
2016 $77 $103.3 Unknown
2017 $3003132 $394 Enhanced Upper Stage (EUS)
2018 $30033 $384.6 Enhanced Upper Stage (EUS)
2019 $1503435 $188.9 Enhanced Upper Stage (EUS)
2020 $30036 $373.2 Enhanced Upper Stage (EUS)
2021 $40037 $475.3 Block 1B (including EUS)
2022 $636.738 $700.5 Block 1B
2023 $648.339 $685 Block 1B (including EUS)
2024 $462.540 $474.7 Block 1B

Total development costs

In 2025, the spending plan reverted back to listing an overall SLS launch vehicle development cost for the year,41 but gave the total cumulative EUS development cost as $1.93 billion.42

Further SLS Block 1B funding is not requested in the FY 2027 budget, and its total development cost is estimated as $3.9047 billion.43

Other costs

Kennedy Space Center modifications to facilitate the Exploration Upper Stage were budgeted to cost $90.1 million in 2018,44 and £13.3 million in 2019.45

See also

See also

References

References

  1. "NASA, Boeing Finalize US$2.8 billion SLS Core Stage Contract". SpaceNews. July 4, 2014. Retrieved July 25, 2014.
  2. "Space Launch System Fact Sheet" (PDF). NASA. Retrieved May 16, 2023.
  3. "Space Launch System". Spaceflight Insider. September 9, 2018. Archived from the original on October 5, 2021. Retrieved October 4, 2021.
  4. "1 year down, a galaxy to go". Boeing. Retrieved April 13, 2024.
  5. Donahue, Benjamin; Sigmon, Sheldon; Cooper, Darby (July 9, 2018). The NASA SLS Exploration Upper Stage Development & Mission Opportunities. 2018 Joint Propulsion Conference. Cincinnati, Ohio: American Institute of Aeronautics and Astronautics. doi:10.2514/6.2018-4639. ISBN 978-1-62410-570-8.
  6. "RL10 Engine". Aerojet Rocketdyne. Archived from the original on November 7, 2021. Retrieved November 18, 2021.
  7. "Space Launch System Data Sheet". SpaceLaunchReport.com. January 22, 2013. Archived from the original on October 24, 2013. Retrieved March 7, 2026.
  8. Gebhardt, Chris (June 6, 2014). "NASA confirms EUS for SLS Block IB design and EM-2 flight". NASASpaceflight. NASASpaceflight.com. Retrieved July 25, 2014.
  9. Gebhardt, Chris (November 20, 2013). "New SLS mission options explored via new Large Upper Stage". NASASpaceflight. NASASpaceflight.com. Retrieved March 7, 2026.
  10. "SLS prepares for PDR – Evolution eyes Dual-Use Upper Stage". NASASpaceFlight. June 1, 2013. Retrieved July 25, 2014.
  11. "SLS". Gunter's Space Page. Retrieved July 25, 2014.
  12. Bergin, Chris (March 28, 2014). "SLS positioning for ARRM and Europa missions". NASASpaceflight.com. Retrieved November 8, 2014.
  13. Bergin, Chris (November 21, 2013). "New SLS mission options explored via new Large Upper Stage". NASASpaceFlight.com. Retrieved June 14, 2026.
  14. "Proven Engine Packs Big, In-Space Punch for NASA's SLS Rocket". NASA. October 21, 2016. Retrieved November 18, 2021.
  15. NASA completes Exploration Upper Stage CDR, focuses new office on SLS Block 1B development. Feb 2021.
  16. Foust, Jeff (October 30, 2022). "Lunar landing restored for Artemis IV mission". SpaceNews. Retrieved October 31, 2022.
  17. Upper Stage RL10s arrive at Stennis for upcoming SLS launches. February 2020.
  18. "SLS Exploration Upper Stage passes review". SpaceNews. December 22, 2020.
  19. "With all-composite cryogenic tank, Boeing eyes mass-reducing space, aviation applications". January 28, 2016. Retrieved June 2, 2024.
  20. Berger, Eric (May 2, 2025). "White House budget seeks to end SLS, Orion, and Lunar Gateway programs". Ars Technica. Retrieved May 2, 2025.
  21. Dooren, Jennifer M.; Stevens, Bethany (May 2, 2025). "President Trump's FY26 Budget Revitalizes Human Space Exploration" (Press release). NASA. 25-035. Retrieved May 2, 2025.
  22. "Fiscal Year 2026 Discretionary Budget Request" (PDF). United States Office of Management and Budget. May 2, 2025. p. 37. Retrieved May 2, 2025.
  23. Smith, Marcia (July 3, 2025). "Trump Megabill Includes Billions for Artemis, ISS, Moving a Space Shuttle to Texas and more". SpacePolicyOnline.com. Retrieved July 3, 2025.
  24. Berger, Eric (February 27, 2026). "NASA shakes up its Artemis program to speed up lunar return". Ars Technica. Retrieved February 2, 2026.
  25. Foust, Jeff (February 27, 2026). "NASA revises plans for future Artemis missions, cancels upgrades to SLS". SpaceNews. Retrieved March 2, 2026.
  26. Taveau, Jessica (February 27, 2026). "NASA Adds Mission to Artemis Lunar Program, Updates Architecture". NASA. Retrieved March 2, 2026.
  27. NASA. "FY 2013 President's Budget Request Summary" (PDF). nasa.gov. p. 4. Retrieved June 14, 2026.
  28. NASA. "National Aeronautics And Space Administration FY 2014 Spending Plan for Appropriations Provided By P.L. 113-76" (PDF). nasa.gov. Retrieved June 14, 2026.
  29. NASA. "FY 2016 President's Budget Request Summary" (PDF). nasa.gov. Retrieved June 14, 2026.
  30. NASA. "FY 2015 NASA Spending Plan" (PDF). nasa.gov. Retrieved June 14, 2026.
  31. NASA (August 2017). "NATIONAL AERONAUTICS AND SPACE ADMINISTRATION FY 2017 SPENDING PLAN FOR FY 2017 NASA Spending Plan" (PDF). nasa.gov. p. 3. Retrieved June 14, 2026.
  32. "NASA outlines plan for 2024 lunar landing". SpaceNews. May 1, 2019. Archived from the original on September 30, 2021. Retrieved May 15, 2019.
  33. NASA (July 2018). "NATIONAL AERONAUTICS AND SPACE ADMINISTRATION FY 2018 SPENDING PLAN" (PDF). nasa.gov. p. 4. Retrieved June 14, 2026.
  34. Sloss, Philip (December 18, 2019). "Amid competing priorities, Boeing redesigns NASA SLS Exploration Upper Stage". NASASpaceFlight.com. Archived from the original on August 7, 2020. Retrieved July 25, 2020.
  35. NASA (June 2019). "NATIONAL AERONAUTICS AND SPACE ADMINISTRATION FY 2019 SPENDING PLAN" (PDF). nasa.gov. p. 5. Retrieved June 14, 2026.
  36. "National Aeronautics and Space Administration FY 2020 Spending Plan for Appropriations Provided by P.L. 116-93 and P.L. 116-136" (PDF). July 2020. p. 5. Retrieved June 2, 2024.
  37. "National Aeronautics and Space Administration FY 2021 Spending Plan for Appropriations Pursuant to P.L. 116-260" (PDF). June 2021. Retrieved June 2, 2024.
  38. "National Aeronautics and Space Administration FY 2022 Spending Plan for Appropriations Provided by P.L. 117-103" (PDF). July 2022. Retrieved June 2, 2024.
  39. "National Aeronautics and Space Administration FY 2023 Spending Plan for Appropriations Provided by P.L. 117-328" (PDF). March 2023. Retrieved June 2, 2024.
  40. NASA. "National Aeronautics and Space Administration FY 2024 Spending Plan For Appropriations Provided By P.L. 118-42" (PDF). nasa.gov. p. 5. Retrieved June 14, 2026.
  41. NASA (March 2026). "National Aeronautics And Space Administration FY 2025 Spending Plan For Appropriations Provided by P.L. 119-4" (PDF). nasa.gov. Retrieved June 14, 2026.
  42. NASA (2025). "FY 2025 President's Budget Request Summary" (PDF). nasa.gov. p. 52. Retrieved June 14, 2026.
  43. NASA (2026). "COST AND SCHEDULE PERFORMANCE SUMMARY" (PDF). nasa.gov. p. 369. Retrieved June 14, 2026.
  44. NASA. "FY 2018 Budget Request" (PDF). nasa.gov. p. 11. Retrieved June 14, 2026.
  45. NASA. "FY 2019 Budget Request" (PDF). nasa.gov. p. 14. Retrieved June 14, 2026.