Enterprise resource planning (ERP) is the integrated management of main business processes, often in real time and mediated by software and technology. ERP is usually referred to as a category of business management software—typically a suite of integrated applications—that an organization can use to collect, store, manage and interpret data from many business activities.

Last revised
Jul 10, 2026
Read time
≈ 36 min
Length
8,207 w
Citations
86
Source
Refer to caption
Diagram showing some typical ERP modules source ↗

Enterprise resource planning (ERP) is the integrated management of main business processes, often in real time and mediated by software and technology. ERP is usually referred to as a category of business management software—typically a suite of integrated applications—that an organization can use to collect, store, manage and interpret data from many business activities.

The finance module in particular is essential to a suite of applications meeting the definition of an ERP system1. The finance module provides the system of record for the organisation; recording the commercial impact of the business operations in the General Ledger.

ERP systems can be local-based or cloud-based. Cloud-based applications have grown rapidly since the early 2010s due to the increased efficiencies arising from information being readily available from any location with Internet access. However, ERP differs from integrated business management systems by including planning all resources that are required in the future to meet business objectives. This includes plans for getting suitable staff and manufacturing capabilities for future needs.

ERP provides an integrated and continuously updated view of core business processes, typically using a shared database managed by a database management system. ERP systems track business resources—cash, raw materials, production capacity—and the status of business commitments: orders, purchase orders, and payroll. The applications that make up the system share data across various departments (manufacturing, purchasing, sales, accounting, etc.) that provide the data.2 ERP facilitates information flow between all business functions and manages connections to outside stakeholders.3

Estimates of the size of the global ERP market range between USD $78 and $81 billion in 20264 5. Though early ERP systems focused on large enterprises, smaller enterprises increasingly use ERP systems.6

The ERP system integrates varied organizational systems and facilitates error-free transactions and production, thereby enhancing the organization's efficiency. However, developing an ERP system differs from traditional system development.7 ERP systems run on a variety of computer hardware and network configurations, typically using a database as an information repository.8

Origin

Business and technology research and advisory firm Gartner is credited for first using the acronym ERP in the 1990s.910 The term captured a functional extension of two manufacturing-based concepts, material requirements planning (MRP) and manufacturing resource planning (MRP II). Without replacing these terms, ERP came to represent a larger whole that reflected the evolution of application integration beyond manufacturing.11

Not all ERP packages are developed from a manufacturing core; ERP vendors variously began assembling their packages with finance-and-accounting, maintenance, and human-resource components. By the mid-1990s ERP systems addressed all core enterprise functions. Governments and non–profit organizations also began to use ERP systems.12 An "ERP system selection methodology" is a formal process for selecting an enterprise resource planning (ERP) system. Existing methodologies include: Kuiper's funnel method, Dobrin's three-dimensional (3D) web-based decision support tool, and the Clarkston Potomac methodology.13

Expansion

ERP systems experienced rapid growth in the 1990s. Because of the year 2000 problem many companies took the opportunity to replace their old systems with ERP.14

ERP systems initially focused on automating back office functions that did not directly affect customers and the public. Front office functions, such as customer relationship management (CRM), dealt directly with customers, or e-business systems such as e-commerce and e-government—or supplier relationship management (SRM) became integrated later, when the internet simplified communicating with external parties.15

"ERP II" was coined in 2000 in an article by Gartner Publications entitled ERP Is Dead—Long Live ERP II.1617 It describes web–based software that provides real–time access to ERP systems to employees and partners (such as suppliers and customers). The ERP II role expands traditional ERP resource optimization and transaction processing. Rather than just manage buying, selling, etc.—ERP II leverages information in the resources under its management to help the enterprise collaborate with other enterprises.18 ERP II is more flexible than the first generation ERP. Rather than confine ERP system capabilities within the organization, it goes beyond the corporate walls to interact with other systems. Enterprise application suite is an alternate name for such systems. ERP II systems are typically used to enable collaborative initiatives such as supply chain management (SCM), customer relationship management (CRM) and business intelligence (BI) among business partner organizations through the use of various electronic business technologies.1920 The large proportion of companies are pursuing a strong managerial targets in ERP system instead of acquire an ERP company.21

Developers now make more effort to integrate mobile devices with the ERP system. ERP vendors are extending ERP to these devices, along with other business applications, so that businesses don't have to rely on third-party applications.22 As an example, the e-commerce platform Shopify was able to make ERP tools from Microsoft and Oracle available on its app in October 2021.22

Technical stakes of modern ERP concern integration—hardware, applications, networking, supply chains. ERP now covers more functions and roles—including decision making, stakeholders' relationships, standardization, transparency, globalization, etc.23

Functional areas

An ERP system covers the following common functional areas. In many ERP systems, these are called and grouped together as ERP modules:

GRP – ERP use in government

Government resource planning (GRP) is the equivalent of an ERP for the public sector and an integrated office automation system for government bodies.24 The software structure, modularization, core algorithms and main interfaces do not differ from other ERPs, and ERP software suppliers manage to adapt their systems to government agencies.252627

Both system implementations, in private and public organizations, are adopted to improve productivity and overall business performance in organizations, but comparisons (private vs. public) of implementations shows that the main factors influencing ERP implementation success in the public sector are cultural.282930

Best practices

Most ERP systems incorporate best practices. This means the software reflects the vendor's interpretation of the most effective way to perform each business process. Systems vary in how conveniently the customer can modify these practices.31

Use of best practices eases compliance with requirements such as International Financial Reporting Standards, Sarbanes–Oxley, or Basel II. They can also help comply with de facto industry standards, such as electronic funds transfer. This is because the procedure can be readily codified within the ERP software and replicated with confidence across multiple businesses that share that business requirement.3233

Connectivity to plant floor information

ERP systems connect to real–time data and transaction data in a variety of ways. These systems are typically configured by systems integrators, who bring unique knowledge on process, equipment, and vendor solutions.

Direct integration – ERP systems have connectivity (communications to plant floor equipment) as part of their product offering. This requires that the vendors offer specific support for the plant floor equipment their customers operate.

Database integration – ERP systems connect to plant floor data sources through staging tables in a database. Plant floor systems deposit the necessary information into the database. The ERP system reads the information in the table. The benefit of staging is that ERP vendors do not need to master the complexities of equipment integration. Connectivity becomes the responsibility of the systems integrator.

Enterprise appliance transaction modules (EATM) – These devices communicate directly with plant floor equipment and with the ERP system via methods supported by the ERP system. EATM can employ a staging table, web services, or system–specific program interfaces (APIs). An EATM offers the benefit of being an off–the–shelf solution.

Custom–integration solutions – Many system integrators offer custom solutions. These systems tend to have the highest level of initial integration cost, and can have a higher long term maintenance and reliability costs. Long term costs can be minimized through careful system testing and thorough documentation. Custom–integrated solutions typically run on workstation or server-class computers.

Implementation

ERP's scope usually implies significant changes to staff work processes and practices.34 Generally, three types of services are available to help implement such changes: consulting, customization, and support.34 Implementation time depends on business size, number of modules, customization, the scope of process changes, and the readiness of the customer to take ownership for the project. Modular ERP systems can be implemented in stages. The typical project for a large enterprise takes about 14 months and requires around 150 consultants.35 Small projects can require months; multinational and other large implementations can take years.3637 Customization can substantially increase implementation times.35

Besides that, information processing influences various business functions e.g. some large corporations like Walmart use a just in time inventory system. This reduces inventory storage and increases delivery efficiency, and requires up-to-date data. Before 2014, Walmart used a system called Inforem developed by IBM to manage replenishment.38

Project methodology

The outcome of the implementation process will be significantly impacted by the skills and experience of the implementing team combined with a tried and tested implementation methodology that provides guardrails to drive the project to success. ERP implementations are a specific sub-type of project however there is no industry-specified standard methodology.39 Implementation methodologies are created by the ERP vendors or the specialist ERP consulting firms, generally known as Value Added Resellers (VARs), who carry out the implementations. Each implementer's methodology can be assessed as to how well it meets the principles and practices outlined in the guides of the project management peak industry bodies such as Project Management Institute.

Process preparation

Implementing ERP typically requires changes in existing business processes.40 Poor understanding of needed process changes prior to starting implementation is a main reason for project failure.41 The difficulties could be related to the system, business process, infrastructure, training, or lack of motivation.

It is therefore crucial that organizations thoroughly analyze processes before they deploy an ERP software. Analysis can identify opportunities for process modernization. It also enables an assessment of the alignment of current processes with those provided by the ERP system. Research indicates that risk of business process mismatch is decreased by:

  • Linking current processes to the organization's strategy
  • Analyzing the effectiveness of each process
  • Understanding existing automated solutions4243

ERP implementation is considerably more difficult (and politically charged) in decentralized organizations, because they often have different processes, business rules, data semantics, authorization hierarchies, and decision centers.44 This may require migrating some business units before others, delaying implementation to work through the necessary changes for each unit, possibly reducing integration (e.g., linking via master data management) or customizing the system to meet specific needs.45

A potential disadvantage is that adopting "standard" processes can lead to a loss of competitive advantage. While this has happened, losses in one area are often offset by gains in other areas, increasing overall competitive advantage.4647

Configuration

Configuring an ERP system is largely a matter of balancing the way the organization wants the system to work, and the way the system is designed to work out of the box. ERP systems typically include many configurable settings that in effect modify system operations. For example, in the ServiceNow platform, business rules can be written requiring the signature of a business owner within 2 weeks of a newly completed risk assessment. The tool can be configured to automatically email notifications to the business owner, and transition the risk assessment to various stages in the process depending on the owner's responses or lack thereof.

Two-tier enterprise resource planning

Two-tier ERP software and hardware lets companies run the equivalent of two ERP systems at once: one at the corporate level and one at the division or subsidiary level. For example, a manufacturing company could use an ERP system to manage across the organization using independent global or regional distribution, production or sales centers, and service providers to support the main company's customers. Each independent center (or) subsidiary may have its own business operations cycles, workflows, and business processes.

Given the realities of globalization, enterprises continuously evaluate how to optimize their regional, divisional, and product or manufacturing strategies to support strategic goals and reduce time-to-market while increasing profitability and delivering value.48 With two-tier ERP, the regional distribution, production, or sales centers and service providers continue operating under their own business model—separate from the main company, using their own ERP systems. Since these smaller companies' processes and workflows are not tied to main company's processes and workflows, they can respond to local business requirements in multiple locations.49

Factors that affect enterprises' adoption of two-tier ERP systems include:

  • Manufacturing globalization, the economics of sourcing in emerging economies
  • Potential for quicker, less costly ERP implementations at subsidiaries, based on selecting software more suited to smaller companies
  • Extra effort, (often involving the use of enterprise application integration) is required where data must pass between two ERP systems50 Two-tier ERP strategies give enterprises agility in responding to market demands and in aligning IT systems at a corporate level while inevitably resulting in more systems as compared to one ERP system used throughout the organization.51

An alternative to a two-tier approach is to use as an ERP system which allows for multiple workflows to be configured for the same function. This allows each operation or division to have its own workflow, say for order entry. This avoids the need to integrate two ERP systems as all divisions and operations are running within the same ERP system.52

Customization

ERP systems are theoretically based on industry best practices, and their makers intend that organizations deploy them "as is".5354 ERP vendors do offer customers configuration options that let organizations incorporate their own business rules, but gaps in features often remain even after configuration is complete.

ERP customers have several options to reconcile feature gaps, each with their own pros/cons. Technical solutions include rewriting part of the delivered software, writing a homegrown module to work within the ERP system, or interfacing to an external system. These three options constitute varying degrees of system customization—with the first being the most invasive and costly to maintain.55 Alternatively, there are non-technical options such as changing business practices or organizational policies to better match the delivered ERP feature set. Key differences between customization and configuration include:

  • Customization is always optional, whereas the software must always be configured before use (e.g., setting up cost/profit center structures, organizational trees, purchase approval rules, etc.).
  • The software is designed to handle various configurations and behaves predictably in any allowed configuration.
  • The effect of configuration changes on system behavior and performance is predictable and is the responsibility of the ERP vendor. The effect of customization is less predictable. It is the customer's responsibility, and increases testing requirements.
  • Configuration changes survive upgrades to new software versions. Some customizations (e.g., code that uses pre–defined "hooks" that are called before/after displaying data screens) survive upgrades, though they require retesting. Other customizations (e.g., those involving changes to fundamental data structures) are overwritten during upgrades and must be re-implemented.56

Advantages of customization include:

  • Improving user acceptance57
  • Potential to obtain competitive advantage vis-à-vis companies using only standard features.

Customization's disadvantages include that it may:

  • Increase time and resources required to implement and maintain5558
  • Hinder seamless interfacing/integration between suppliers and customers due to the differences between systems58
  • Limit the company's ability to upgrade the ERP software in the future58
  • Create overreliance on customization, undermining the principles of ERP as a standardizing software platform

Extensions

ERP systems can be extended with third-party software, often via vendor-supplied interfaces.5960 Extensions offer features such as:60

Data migration

Data migration is the process of moving, copying, and restructuring data from an existing system to an enterprise resource planning (ERP) system. It is a critical component of a successful implementation and requires thorough planning. However, because migration typically occurs near the end of the implementation process, it often receives inadequate attention. The following steps can help structure an effective migration plan:61

  • Identify the data to be migrated.
  • Determine the migration timing.
  • Generate data migration templates for key data components
  • Freeze the toolset.
  • Decide on the migration-related setup of key business accounts.
  • Define data archiving policies and procedures.

Often, data migration is incomplete because some of the data in the existing system is either incompatible or not needed in the new system. As such, the existing system may need to be kept as an archived database to refer back to once the new ERP system is in place.61

Advantages

The most fundamental advantage of ERP is that the integration of a myriad of business processes saves time and expense. Management can make decisions faster and with fewer errors. Data becomes visible across the organization. Tasks that benefit from this integration include:62

  • Sales forecasting, which allows inventory optimization.
  • Chronological history of every transaction through relevant data compilation in every area of operation.
  • Order tracking, from acceptance through fulfillment
  • Revenue tracking, from invoice through cash receipt
  • Matching purchase orders (what was ordered), inventory receipts (what arrived), and costing (what the vendor invoiced)

ERP systems centralize business data, which:

  • Eliminates the need to synchronize changes between multiple systems—consolidation of finance, marketing, sales, human resource, and manufacturing applications
  • Brings legitimacy and transparency to each bit of statistical data
  • Facilitates standard product naming/coding
  • Provides a comprehensive enterprise view (no "islands of information"), making real–time information available to management anywhere, anytime to make proper decisions
  • Protects sensitive data by consolidating multiple security systems into a single structure63

Benefits

  • ERP creates a more agile company that adapts better to change. It also makes a company more flexible and less rigidly structured so organization components operate more cohesively, enhancing the business—internally and externally.64
  • ERP can improve data security in a closed environment. A common control system, such as the kind offered by ERP systems, allows organizations the ability to more easily ensure key company data is not compromised. This changes, however, with a more open environment, requiring further scrutiny of ERP security features and internal company policies regarding security.65
  • ERP provides increased opportunities for collaboration. Data takes many forms in the modern enterprise, including documents, files, forms, audio and video, and emails. Often, each data medium has its own mechanism for allowing collaboration. ERP provides a collaborative platform that lets employees spend more time collaborating on content rather than mastering the learning curve of communicating in various formats across distributed systems.60
  • ERP is enhanced decision-making capabilities. By consolidating data from various departments and functions into a single, unified platform, ERP systems provide decision-makers with real-time insights and comprehensive analytics. This enables more informed and data-driven decision-making processes across the organization, leading to improved strategic planning, resource allocation, and overall business performance. Moreover, ERP systems facilitate better forecasting and trend analysis, helping businesses anticipate market changes, identify opportunities, and mitigate risks more effectively.66

Disadvantages

  • Customization can be problematic. Compared to the best-of-breed approach, ERP can be seen as meeting an organization's lowest common denominator needs, forcing the organization to find workarounds to meet unique demands.67
  • Re-engineering business processes to fit the ERP system may damage competitiveness or divert focus from other critical activities.
  • ERP can cost more than less integrated or less comprehensive solutions.
  • High ERP switching costs can increase the ERP vendor's negotiating power, which can increase support, maintenance, and upgrade expenses.
  • Overcoming resistance to sharing sensitive information between departments can divert management attention.
  • Integration of truly independent businesses can create unnecessary dependencies.
  • Extensive training requirements take resources from daily operations.
  • Harmonization of ERP systems can be a mammoth task (especially for big companies) and requires a lot of time, planning, and money.68

Adoption rates

Research published in 2011 based on a survey of 225 manufacturers, retailers and distributors found "high" rates of interest and adoption of ERP systems and that very few businesses were "completely untouched" by the concept of an ERP system. 27% of the companies survey had a fully operational system, 12% were at that time rolling out a system and 26% had an existing ERP system which they were extending or upgrading.69

Postmodern ERP

The term "postmodern ERP" was coined by Gartner in 2013, when it first appeared in the paper series "Predicts 2014".70 According to Gartner's definition of the postmodern ERP strategy, legacy, monolithic and highly customized ERP suites, in which all parts are heavily reliant on each other, should sooner or later be replaced by a mixture of both cloud-based and on-premises applications, which are more loosely coupled and can be easily exchanged if needed.70

The basic idea is that there should still be a core ERP solution that would cover most important business functions, while other functions will be covered by specialist software solutions that merely extend the core ERP. This concept is similar to the "best-of-breed" approach71 to software execution, but it shouldn't be confused with it. While in both cases, applications that make up the whole are relatively loosely connected and quite easily interchangeable, in the case of the latter there is no ERP solution whatsoever. Instead, every business function is covered by a separate software solution.72

There is, however, no golden rule as to what business functions should be part of the core ERP, and what should be covered by supplementary solutions. According to Gartner, every company must define their own postmodern ERP strategy, based on company's internal and external needs, operations and processes.70 For example, a company may define that the core ERP solution should cover those business processes that must stay behind the firewall, and therefore, choose to leave their core ERP on-premises. At the same time, another company may adopt a hybrid ERP approach, hosting the core ERP solution in the cloud while moving only a few ERP modules as supplementary solutions to on-premises.73

The main benefits that companies will gain from implementing postmodern ERP strategy are speed and flexibility when reacting to unexpected changes in business processes or on the organizational level.74 With the majority of applications having a relatively loose connection, it is fairly easy to replace or upgrade them whenever necessary. In addition to that, following the examples above, companies can select and combine cloud-based and on-premises solutions that are most suited for their ERP needs. The downside of postmodern ERP is that it will most likely lead to an increased number of software vendors that companies will have to manage, as well as pose additional integration challenges for the central IT.75

See also

See also

References

References

  1. "ERP finance module". 27 November 2023.
  2. Almajali, Dmaithan (2016). "Antecedents of ERP systems implementation success: a study on Jordanian healthcare sector". Journal of Enterprise Information Management. 29 (4): 549–565. doi:10.1108/JEIM-03-2015-0024.
  3. Radovilsky, Zinovy (2004). Bidgoli, Hossein (ed.). The Internet Encyclopedia, Volume 1. John Wiley & Sons, Inc. p. 707. ISBN 978-0-471-22202-6.
  4. "ERP Systems Market Share: 2026 Guide to Buyers & Trends".
  5. Leichter, Rasmus (16 October 2025). "How Big is the ERP Market? (2025)".
  6. Runtong Zhang; José Cordeiro; Xuewei Li; Zhenji Zhang; Juliang Zhang (2011). ACCEPTANCE OF ENTERPRISE RESOURCE PLANNING SYSTEMS BY SMALL MANUFACTURING ENTERPRISES. Proceedings of the 13th International Conference on Enterprise Information Systems. SciTePress - Science and Technology Publications. pp. 229–238. doi:10.5220/0003500302290238. ISBN 978-989-8425-53-9.
  7. Shaul, L.; Tauber, D. (2012). "CSFs along ERP life-cycle in SMEs: a field study". Industrial Management & Data Systems. 112 (3): 360–384. doi:10.1108/02635571211210031.
  8. Khosrow–Puor, Mehdi (2006). Emerging Trends and Challenges in Information Technology Management. Idea Group, Inc. p. 865.
  9. InfoWorld, Heather Harreld (27 August 2001). "Extended ERP technology reborn in B2B". Retrieved 20 July 2016.
  10. Savin, Jerald (2025). "Preface - IT Auditing". IT Auditing: The Practitioner's Guide to Reliable Information Automation. Taylor & Francis. ISBN 978-1-040-25977-1. Automation was clearly part of the business by the 1960s and 1970s and was fully on this path before Gartner coined the acronym ERP in the 1990s. ERP, Enterprise Resource Planning, focused on the capabilities of these systems and their integration.
  11. Shields, Murrell G. (2005). E-Business and ERP: Rapid Implementation and Project Planning. Wiley. p. 9. Even the term ERP is a successor to the manufacturing term MRP (materials requirement planning) and came into use when vendors started to fill out the suite of applications provided beyond the manufacturing areas.
  12. Chang, SI; Guy Gable; Errol Smythe; Greg Timbrell (2000). A Delphi examination of public sector ERP implementation issues. International Conference on Information Systems. Atlanta: Association for Information Systems. pp. 494–500. Retrieved 9 September 2008.
  13. Frédéric Adam, David Sammon (2004), The enterprise resource planning decade, Idea Group Inc (IGI), p. 94, ISBN 978-1-59140-262-6
  14. Bret Wagner; Ellen Monk (4 February 2008). Enterprise Resource Planning. Cengage Learning EMEA. ISBN 978-1-4239-0179-2.
  15. Hayman, L. (2000). "ERP in the Internet Economy". Information Systems Frontiers. 2000 (2): 137–139. doi:10.1023/A:1026595923192. S2CID 207642319.
  16. "B. Bond, Y. Genovese, D. Miklovic, N. Wood, B. Zrimsek, N. Rayner, ERP Is Dead — Long Live ERP II; GartnerGroup RAS Services, SPA-12-0420 4 October 2000". Retrieved 23 October 2020.
  17. "ERP: What you need to ask before you buy". projectauditors.com. Retrieved 23 April 2014.
  18. "The Bryan School of Business and Economics at UNCG—Exceptional Problem Solvers" (PDF). Uncg.edu. Archived from the original (PDF) on 12 September 2012. Retrieved 8 November 2012.
  19. Charles Møller (1 August 2005). "ERP II: a conceptual framework for next-generation enterprise systems?". Journal of Enterprise Information Management. 18 (4): 483–497. doi:10.1108/17410390510609626. ISSN 1741-0398.
  20. Ruhi, Umar (1 July 2016). "An experiential learning pedagogical framework for enterprise systems education in business schools". The International Journal of Management Education. 14 (2): 198–211. doi:10.1016/j.ijme.2016.04.006.
  21. Adam, Frédéric; O'Doherty, Peter (December 2000). "Lessons from enterprise resource planning implementations in Ireland – towards smaller and shorter ERP projects". Journal of Information Technology. 15 (4): 305–316. doi:10.1080/02683960010008953 (inactive 1 July 2025). ISSN 0268-3962.{{cite journal}}: CS1 maint: DOI inactive as of July 2025 (link)
  22. "Shopify enlists Microsoft, Oracle for business tools on app". Reuters. 14 October 2021. Retrieved 8 December 2021.
  23. Shaul, L.; Tauber, D. (2013). "Critical Success Factors in Enterprise Resource Planning Systems: Review of the Last Decade". ACM Computing Surveys. 45 (4): 1–39. doi:10.1145/2501654.2501669. S2CID 3657624.
  24. Yunliang, Jiang; Xiongtao, Zhang; Qing, Shen; Jing, Fan; Ning, Zheng (2010). "Design of E-Government Information Management Platform Based on SOA Framework". 2010 First International Conference on Networking and Distributed Computing. pp. 165–169. doi:10.1109/ICNDC.2010.42. ISBN 978-1-4244-8382-2. S2CID 17798379.
  25. Allen, Kern and Havenhand (2000) "ERP Critical Success Factors: an exploration of the contextual factors in public sector institutions", Proceedings of the 35th Hawaii International Conference on System Sciences.
  26. Chang, Gable, Smythe and Timbrell (2000) "A Delphi examination of public sector ERP implementation issues" Proceedings of ICIS.
  27. Ebrahim, Zakareya; Irani, Zahir (2005). "E-government adoption: architecture and barriers". Business Process Management Journal. 11 (5): 589–611. CiteSeerX 10.1.1.453.87. doi:10.1108/14637150510619902.
  28. Wingreen, Maryam and Hritik (2014) "An Investigation into Enterprise Resource Planning Implementation Success: Evidence from Private and Public Sector Organizations", PACIS 2014/339.
  29. Shafqat Ali Shad; Chen, Enhong; Faisal Malik Faisal Azeem (2012). "Enterprise Resource Planning - Real blessing or a Blessing in Disguise: An Exploration of the Contextual Factors in Public Sector". arXiv:1207.2860 [cs.CY].
  30. Coelho, Cunha; Meirelles (2015). "The client-consultant relationship in the implementation of ERP in government: Exploring the dynamic between power and knowledge". Proceedings of the 16th Annual International Conference on Digital Government Research. p. 140. doi:10.1145/2757401.2757405. ISBN 978-1-4503-3600-0. S2CID 13941079.
  31. Monk, Ellen and Wagner, Brett."Concepts in Enterprise Resource Planning" 3rd ed. Course Technology Cengage Learning. Boston, Massachusetts.2009
  32. Ingolfo, S.; Siena, A.; Mylopoulos, J. (2011). "Establishing Regulatory Compliance for Software Requirements". Conceptual Modeling – ER 2011. Lecture Notes in Computer Science. Vol. 6998. pp. 47–61. doi:10.1007/978-3-642-24606-7_5. ISBN 978-3-642-24605-0.
  33. "IT Systems Validation for SOx and Regulatory Compliance". Insights. MetricStream, Inc. Retrieved 9 May 2018.
  34. "ERP (Enterprise Resource Planning)". Tech-faq.com. 5 March 2014. Retrieved 14 July 2015.
  35. "Critical Issues Affecting an ERP Implementation". Information Systems Management. Auerbach Publications. 1999. p. 7. Archived from the original on January 3, 2013. Retrieved January 10, 2013.
  36. Sankar, C.; Rau, K.-H. (2006). Implementation Strategies for SAP R/3 in a Multinational Organization: Lessons from a Real-World Case Study. Cybertech Publishing. p. 8. ISBN 978-1-59140-778-2. Retrieved 9 May 2018.
  37. Pelphrey, M.W. (2015). Directing the ERP Implementation: A Best Practice Guide to Avoiding Program Failure Traps While Tuning System Performance. CRC Press. pp. 92–111. ISBN 978-1-4822-4842-5.
  38. "Wal-Mart slow to roll out new replenishment system". Business, Political, and Cultural News in Fort Smith and Northwest Arkansas. Arkansas: Thecitywire.com. 8 January 2014. Retrieved 14 July 2015.
  39. Diaz, A.E. (October 2006). "Methodologies to implement ERP systems".
  40. Turban et al. (2008). Information Technology for Management, Transforming Organizations in the Digital Economy. Massachusetts: John Wiley & Sons, Inc., pp. 300–343. ISBN 978-0-471-78712-9
  41. Brown, C.; Vessey, I. (2003). "Managing the Next Wave of Enterprise Systems: Leveraging Lessons from ERP". MIS Quarterly Executive. 2 (1).
  42. King. W., "Ensuring ERP implementation success," Information Systems Management, Summer 2005.
  43. Yusuf, Y., A. Gunasekaran, and M. Abthorpe, "Enterprise Information Systems Project Implementation: A Case Study of ERP in Rolls-Royce," International Journal of Production Economics, 87(3), February 2004.
  44. Daneva, Maya; Roel Wieringa. "Requirements Engineering for Cross-organizational ERP Implementation: Undocumented Assumptions and Potential Mismatches" (PDF). University of Twente. Archived from the original (PDF) on 5 July 2010. Retrieved 12 July 2008.
  45. Thomas H. Davenport, "Putting the Enterprise into the Enterprise System", Harvard Business Review, July–August 1998.
  46. Turban et al. (2008). Information Technology for Management, Transforming Organizations in the Digital Economy. Massachusetts: John Wiley & Sons, Inc., p. 320. ISBN 978-0-471-78712-9
  47. Dehning, B. and T.Stratopoulos, 'Determinants of a Sustainable Competitive Advantage Due to an IT-enabled Strategy,' Journal of Strategic Information Systems, Vol. 12, 2003
  48. Ferdows, K (1997). "Making the most of foreign factories". Harvard Business Review. 75 (2): 73–88.
  49. Gill, R. (2011). "The rise of two-tier ERP." Strategic Finance, 93(5), 35–40, 1.
  50. Montgomery, Nigel (2010)."Two-Tier ERP Suite Strategy: Considering Your Options." Gartner Group. July 28, 2010. Retrieved September 20, 2012.
  51. Kovacs, G. L.; Paganelli, P. (2003). "A planning and management infrastructure for large, complex, distributed projects — beyond ERP and SCM" (PDF). Computers in Industry. 51 (2): 165–183. CiteSeerX 10.1.1.474.6993. doi:10.1016/s0166-3615(03)00034-4.
  52. "Workflow Management Systems and ERP Systems: Differences, Commonalities, and Applications". corescholar.libraries.wright.edu. Retrieved 21 January 2026.
  53. Kraemmerand, P.; et al. (2003). "ERP implementation: an integrated process of radical change and continuous learning". Production Planning & Control. 14 (4): 228–248. doi:10.1080/0953728031000117959. S2CID 108921043.
  54. Vilpola, Inka Heidi (2008). "A method for improving ERP implementation success by the principles and process of user-centred design". Enterprise Information Systems. 2 (1): 47–76. Bibcode:2008EntIS...2...47V. doi:10.1080/17517570701793848. S2CID 3032440.
  55. Fryling, Meg (2010). "Estimating the impact of enterprise resource planning project management decisions on post-implementation maintenance costs: a case study using simulation modelling". Enterprise Information Systems. 4 (4): 391–421. Bibcode:2010EntIS...4..391F. doi:10.1080/17517575.2010.519785. S2CID 34298012.
  56. Yakovlev, I.V. (2002). "An ERP implementation and business process reengineering at a Small University". Educause Quarterly. 2: 52–57.
  57. Fryling, Meg (2010). Total Cost of Ownership, System Acceptance and Perceived Success of Enterprise Resource Planning Software: Simulating a Dynamic Feedback Perspective of ERP in the Higher Education Environment. p. 403. ISBN 978-1-109-74428-6.
  58. Bradford, M. (2015). Modern ERP: Select, Implement, & Use Today's Advanced Business Systems. Lulu.com. pp. 107–108. ISBN 978-1-312-66598-9. Retrieved 9 May 2018.
  59. Bendoly, E.; Jacobs, F.R. (2005). Strategic ERP Extension and Use. Stanford University Press. p. 95. ISBN 978-0-8047-5098-1. Retrieved 9 May 2018.
  60. Leon, A. (2008). ERP Demystified. Tata McGraw-Hill Education. pp. 170–171. ISBN 978-0-07-065664-2.
  61. Ramaswamy, V.K. (27 September 2007). "Data Migration Strategy in ERP". Information Technology Toolbox, Inc. Archived from the original on 30 October 2007. Retrieved 9 May 2018.
  62. Meer, K.H. (2005). Best Practices in ERP Software Applications. iUniverse. p. 59. ISBN 978-0-595-34513-7. Retrieved 9 May 2018.
  63. Walsh, Katherine (January 2009). "The ERP Security Challenge". CSOonline. CXO Media, Inc. Archived from the original on 4 May 2009. Retrieved 17 January 2008.
  64. O'Brien, James (2011). Management Information Systems(MIS). New York: McGraw-Hill, Irwin. p. 324.
  65. She, W.; Thuraisingham, B. (2007). "Security for Enterprise Resource Planning Systems". Information Systems Security. 16 (3): 152–163. doi:10.1080/10658980701401959. S2CID 16472963.
  66. "ERP gains ground in supply chain manaqement". ProQuest 2705447086.
  67. Young, Joanna (16 May 2014). "AUDIO | Best-of-Breed vs. ERP: What's Best for Higher Ed Today?". The EvoLLLution. Retrieved 14 July 2015.
  68. "The Minefied of Harmonising ERP". Cfo-insight.com. 23 July 2012. Archived from the original on 27 July 2012.
  69. McCrea, B., Supply Chain Technology: Putting the spotlight on ERP, Logistics Management, June 2011, accessed 22 April 2022
  70. "Predicts 2014: The Rise of the Postmodern ERP and Enterprise Applications World". Gartner Group. Retrieved 31 October 2016.
  71. "Postmodern ERP Strategy Is Not a Best-of-Breed Approach". Gartner Group. Retrieved 31 October 2016.
  72. ""ERP, the Future of Applications, and the Composable Enterprise" by Mike Guay". Debbie Wilson. 27 January 2020. Retrieved 12 December 2022.
  73. Ploder, Christian; Bernsteiner, Reinhard; Schlögl, Stephan; Walter, Johannes (2021). "Critical Success Factors of Hybrid-ERP Implementations". In Uden, Lorna; Ting, I-Hsien; Wang, Kai (eds.). Knowledge Management in Organizations. Communications in Computer and Information Science. Vol. 1438. Cham: Springer International Publishing. pp. 305–315. doi:10.1007/978-3-030-81635-3_25. ISBN 978-3-030-81635-3.
  74. Pettey, Christy (27 September 2016). "5 Ugly Truths About Postmodern ERP". Gartner. Retrieved 25 August 2025.
  75. "The end of enterprise resource planning". Chemical & Engineering News. Retrieved 2 June 2020.
Bibliography

Bibliography

External links