Article · Wikipedia archive · Last revised Aug 1, 2026

Tehran Metro Line 7

Line 7, similar to Line 6, and in contrast with Line 3, goes from northwest to southeast and was constructed with modern TBM machines. Its first phase, consisting of 18 km (11 mi) of line and 7 stations, was opened in June 2017. This line has 30.5 km (19.0 mi) with 22 stations right now.

Last revised
Aug 1, 2026
Read time
≈ 1 min
Length
204 w
Citations
3
Source
Tehran Metro Line 7
Overview
Native nameخط ۷ مترو تهران
OwnerTehran Urban and Suburban Railways Organization (Metro)
LocaleTehran, Tehran Province
Termini
  • Varzeshgah-e Takhti
  • Meydan-e Ketab1
Stations22
Service
TypeRapid transit
SystemTehran Metro
Operator(s)Tehran Urban and Suburban Railways Organization (Metro)
DepotTakhti Depot
History
Opened10 June 2017 (10 June 2017)
Last extension19 August 2019
Technical
Line length30.5 km (19.0 mi)
Track gauge1,435 mm (4 ft 8+12 in)
Electrification25 kV AC overhead catenary
Route map

Line 7, similar to Line 6, and in contrast with Line 3, goes from northwest to southeast and was constructed with modern TBM machines. Its first phase, consisting of 18 km (11 mi) of line and 7 stations, was opened in June 2017.2 This line has 30.5 km (19.0 mi) with 22 stations right now.3

Route

Map

References

References

  1. "متروی تهران: تاریخچه مترو". Archived from the original on 25 September 2011. Retrieved 13 December 2014.
  2. First parts of Tehran metro Line 7 inaugurated Archived 2017-06-15 at the Wayback Machine www.tehran.ir Official Tehran's website. June 2017
  3. "مشخصات خط هفت متروی تهران - ایستگاه‌ها". Tehran Urban and Suburban Railways Organization.