![]() A GeForce RTX 5090 Founders Edition released in 2025, the series' flagship model | |
| Release date | January 30, 2025 (2025-01-30) |
|---|---|
| Manufactured by | TSMC |
| Designed by | Nvidia |
| Marketed by | Nvidia |
| Architecture | Blackwell |
| Fabrication process | TSMC 4N1 |
| Cards | |
| Entry-level |
|
| Mid-range |
|
| High-end |
|
| Enthusiast |
|
| API support | |
| Direct3D | Direct3D 12.0 Ultimate (feature level 12_2) Shader Model 6.8 |
| OpenCL | OpenCL 3.0 (64-bit only) |
| OpenGL | OpenGL 4.62 |
| Vulkan | |
| History | |
| Predecessor | GeForce RTX 40 series |
| Support status | |
| Supported | |
The GeForce RTX 50 series of consumer graphics cards is the successor of Nvidia's GeForce 40 series. Announced at CES 2025, it debuted with the release of the RTX 5070, RTX 5080 and RTX 5090 in January 2025. It is based on Nvidia's Blackwell architecture featuring Nvidia RTX's fourth-generation RT cores for hardware-accelerated real-time ray tracing, and fifth-generation deep learning–focused Tensor Cores. The GPUs are manufactured by TSMC on a custom 4N process node.
Background
In March 2024, Nvidia announced the Blackwell architecture for its datacenter products. Like Ampere, the architecture is shared by consumer and datacenter products rather than having distinct architectures released simultaneously like Ada Lovelace for consumers and Hopper for datacenter.
At the Game Awards in December 2024, a cinematic trailer for The Witcher IV was shown that had been pre-rendered on an "unannounced Nvidia GeForce RTX GPU". This was assumed to be an upcoming GeForce RTX 50 series GPU.45 Following the RTX 50 series announcement, Nvidia confirmed that the trailer was "pre-rendered in Unreal Engine 5 on a GeForce RTX 5090".6 Later in the same month, it was reported that Nvidia had begun stockpiling GeForce RTX 50 series units in U.S. warehouses due to a threatened 10% import tariff and 60% tariff on Chinese imports78 that Donald Trump promised in his re-election campaign.910
Announcement

On January 6, 2025, the GeForce RTX 50 series was officially announced for desktop and mobile devices during Nvidia's CES keynote in Las Vegas.11 The pricing announcement was met with surprise as the RTX 5080 at $999 was the same price that the RTX 4080 Super released at a year earlier despite the anticipated price increases.12 Nvidia CEO Jensen Huang falsely1314 claimed that the RTX 5070 could reach "RTX 4090 performance at $549", a figure that relies on the use of DLSS 4 upscaling and Multi Frame generation, and is not an indication of raw performance.15
Features
- Up to 21,760 CUDA cores
- Up to 32 GB of GDDR7 VRAM
- PCIe 5.0 interface
- DisplayPort 2.1b and HDMI 2.1a display connectors

Blackwell architecture
The GeForce RTX 50 series is powered by the Blackwell microarchitecture, which continues Ada Lovelace's emphasis on high graphics frequencies and large L2 caches. The Blackwell architecture introduces Nvidia RTX's fourth-generation RT cores for hardware-accelerated real-time ray tracing and fifth-generation Tensor Cores for AI compute and performing floating-point calculations.16
GDDR7
| Bus width |
Theoretical bandwidth (GB/s) | ||
|---|---|---|---|
| GDDR6X (21 Gbps) |
GDDR7 (28 Gbps) |
GDDR7 (32 Gbps) | |
| 192 bit | 504 | 672 | 768 |
| 256 bit | 672 | 896 | 1024 |
| 384 bit | 1008 | 1344 | 1536 |
| 512 bit | 1344 | 1792 | 2048 |
RTX 50 series GPUs are the first consumer GPUs to feature GDDR7 video memory for greater memory bandwidth over the same bus width compared to the GDDR6 and GDDR6X memory used in the GeForce 40 series. RTX 50 series desktop GPUs use GDDR7 modules from Samsung due to them being available for validation earlier than modules from SK Hynix and Micron.1718
12V-2×6 connector

The GeForce RTX 50 series uses the 16-pin 12V-2×6 connector, which is a revision of the 12VHPWR connector featured on the GeForce 40 series. There were problems with the 12VHPWR connector melting on some RTX 4090 GPUs due to the connector not being fully seated and connector design flaws that did not implement a high enough safety and error tolerance.19 The 12V-2×6 connector revision, published by PCI-SIG in July 2023, addressed this by shortening the four sense pins so the connector will not push any power if it has not been fully seated.20 The 12VHPWR design would still draw up to 150W of power even if the sense pins were not making full contact. 12V-2×6 is backwards compatible with existing 12VHPWR cables and adapters.
Nvidia has mandated to its AIB partners that the 16-pin 12V-2×6 connector be used on all RTX 50 series designs.21 With the GeForce 40 series, the 12VHPWR connector was only mandated on higher power cards such as the RTX 4070 Super, RTX 4070 Ti, RTX 4070 Ti Super, RTX 4080, RTX 4080 Super and RTX 4090 while RTX 4060, RTX 4060 Ti and RTX 4070 AIB designs had the option of using 8-pin PCIe connectors. The 600W-capable 12VHPWR connector would not have been necessary on sub-200W cards.
DLSS 4
| GeForce series | ||||
|---|---|---|---|---|
| RTX 20 | RTX 30 | RTX 40 | RTX 50 | |
| Transformer Model | ||||
| 2× Frame Generation | ||||
| 3−6× Frame Generation | ||||
The fourth generation of Deep Learning Super Sampling (DLSS) was unveiled alongside the RTX 50 series. DLSS 4 upscaling uses a new vision transformer-based model for enhanced image quality with reduced ghosting and greater image stability in motion compared to the previous convolutional neural network (CNN) model.22 DLSS 4 also allows a greater number of frames to be generated and interpolated based on a single traditionally rendered frame. This form of frame generation called Multi Frame Generation is exclusive to the RTX 50 series while the GeForce 40 series is limited to one interpolated frame per traditionally rendered frame. Nvidia claims that DLSS 4's frame generation model uses 30% less video memory with the example of Warhammer 40,000: Darktide using 400 MB less memory at 4K resolution with frame generation enabled.23 Nvidia claims that 75 titles will integrate DLSS 4 Multi Frame Generation at launch, including Alan Wake 2, Cyberpunk 2077, Indiana Jones and the Great Circle, and Star Wars Outlaws.24
Media Engine and I/O
| NVENC25 encoders (9th gen.) |
NVDEC25 decoders (6th gen.) | |
|---|---|---|
| RTX 5050 RTX 5060 RTX 5060 Ti RTX 5070 |
1 | 1 |
| RTX 5070 Ti | 2 | 1 |
| RTX 5080 | 2 | 2 |
| RTX 5090 | 3 | 2 |
The RTX 50 series includes DisplayPort 2.1b UHBR20 (80Gbps) with higher display output data rates to support high resolution and high refresh rate displays.26 The GeForce 40 series received criticism for only including DisplayPort 1.4a (32Gbps) while the competing Radeon RX 7000 series included DisplayPort 2.1 UHBR13.5 (54Gbps). At CES 2025, VESA announced a collaboration with Nvidia on the new DP80LL ("low loss") UHBR20 active cable standard.27 DP80LL allows for 80Gbps DisplayPort 2.1 cables up to 3 meters long as passive DP80 cables are limited in length due to signal integrity concerns.
The RTX 50 series introduces the ninth-generation NVENC encoder and sixth-generation NVDEC video decoder. For the first time in a consumer GeForce GPU, encoding and decoding video in the 4:2:2 color format for professional-grade higher color depth is supported.28
List of GPUs
Desktop
GeForce RTX 50 series desktop GPUs are the second consumer GPUs to utilize a PCIe 5.0 interface29 and the first to feature GDDR7 video memory (except for the entry level RTX 5050 that still uses GDDR6).30 They are fabricated by TSMC using a custom 5 nm process dubbed 4N.3132


| GeForce RTX | 50503334 | 50603536 | 5060 Ti3738 | 507039 | 5070 Ti40 | 508041 | 509042 | |
|---|---|---|---|---|---|---|---|---|
| Release date | 1 Jul 2025 | 19 May 2025 | 16 Apr 2025 | 5 Mar 2025 | 20 Feb 2025 | 30 Jan 2025 | ||
| Launch MSRP (USD) | 249 | 299 | 379(8 GB) 429 (16 GB) |
549 | 749 | 999 | 1,999 | |
| GPU die | GB207-300 | GB206-250 | GB206-300 | GB205-300 | GB203-300 | GB203-400 | GB202-300 | |
| Transistors (billion) | 16.9 | 21.9 | 31.1 | 45.6 | 92.2 | |||
| Die size | 149 mm2 | 181 mm2 | 263 mm2 | 378 mm2 | 750 mm2 | |||
| Core | CUDA cores | 2,560 | 3,840 | 4,608 | 6,144 | 8,960 | 10,752 | 21,760 |
| Texture mapping unit | 80 | 120 | 144 | 192 | 280 | 336 | 680 | |
| Render output unit | 32 | 48 | 80 | 96 | 112 | 176 | ||
| Ray tracing cores | 20 | 30 | 36 | 48 | 70 | 84 | 170 | |
| Tensor cores | 80 | 120 | 144 | 192 | 280 | 336 | 680 | |
| Clock speed (GHz) Boost value (GHz) |
2.31 2.57 |
2.28 2.50 |
2.41 2.57 |
2.16 2.51 |
2.30 2.45 |
2.30 2.62 |
2.01 2.41 | |
| Streaming multiprocessors | 20 | 30 | 36 | 48 | 70 | 84 | 170 | |
| Cache | L1 | 2.5 MB | 3.75 MB | 4.5 MB | 6 MB | 8.75 MB | 10.5 MB | 21.25 MB |
| L2 | 24 MB | 32 MB | 48 MB | 64 MB | 96 MB | |||
| Memory | Type | GDDR6 | GDDR7 | |||||
| Size | 8 GB | 8 GB 16 GB |
12 GB | 16 GB | 32 GB | |||
| Clock (Gb/s) | 20 | 28 | 30 | 28 | ||||
| Bandwidth (GB/s) | 320 | 448 | 672 | 896 | 960 | 1792 | ||
| Bus width | 128-bit | 192-bit | 256-bit | 512-bit | ||||
| Fillrate | Pixel (Gpx/s)a | 82.3 | 119.9 | 123.5 | 201.0 | 235.4 | 293.1 | 423.6 |
| Texture (Gtex/s)b | 205.8 | 299.6 | 370.4 | 482.3 | 686.6 | 879.3 | 1637 | |
| Pro- cessing Power (TFLOPS) |
FP16/FP32c | 13.2 | 19.2 | 23.7 | 30.9 | 43.9 | 56.3 | 104.8 |
| FP64 | 0.21 | 0.30 | 0.37 | 0.48 | 0.69 | 0.88 | 1.64 | |
| Ray tracing | 40 | 58 | 72 | 93.6 | 133.2 | 170.6 | 317.5 | |
| Tensor compute [sparse]d |
52.6 [105.3] |
76.8 [153.5] |
94.9 [189.8] |
123.5 [246.9] |
177.4 [354.8] |
225.1 [450.2] |
419.2 [838.4] | |
| Interface | Host | PCIe 5.0 x8 | PCIe 5.0 x16 | |||||
| Power | 1× 8-pin | 1× 12V-2x6 | ||||||
| Displays | 1× HDMI 2.1b and 3× DisplayPort 2.1b | |||||||
| TDP | 130 W | 145 W | 180 W | 250 W | 300 W | 360 W | 575 W | |
- Pixel fillrate is calculated as the number of render output units (ROPs) multiplied by the base (or boost) core clock speed.
- Texture fillrate is calculated as the number of texture mapping units (TMUs) multiplied by the base (or boost) core clock speed.
- Processing power is calculated as the number of CUDA cores multiplied by 2 (for one fused multiply-add (FMA) operation) times the boost core clock speed.
- Tensor compute is based on GPU Boost Clock at specific tensor precisions (Peak FP8 Tensor TFLOPS with FP32 Accumulate & Peak FP16 Tensor TFLOPS with FP16 Accumulate.
Mobile
Laptops featuring GeForce RTX 50 series laptop GPUs were shown at CES 2025. Laptops with RTX 50 series GPUs were paired with Intel's Arrow Lake-HX and AMD's Strix Point and Fire Range CPUs.4344 Nvidia claims that Blackwell architecture's new Max-Q features can increase battery life by up to 40% over GeForce 40 series laptops.45 For example, Advanced Power Gating saves power by turning off areas of the GPU that are unused and the paired GDDR7 memory can run in an "ultra" low-voltage state.46 Initial RTX 50 series laptops will become available in March 2025 starting at $1,299.47
| GeForce RTX | 5050 Laptop48 |
5060 Laptop49 |
5070 Laptop50 |
5070 Ti Laptop51 |
5080 Laptop52 |
5090 Laptop5354 | |
|---|---|---|---|---|---|---|---|
| Release date | Jun 2025 | May 2025 | Apr 2025 | Mar 2025 | |||
| GPU die | GB207-300 | GB206-200 | GB206-300 | GB205-200 | GB203-250 | GB203-400 | |
| Transistors (billion) | 16.9 | 21.9 | 31.1 | 45.6 | |||
| Die size | 149 mm2 | 181 mm2 | 263 mm2 | 378 mm2 | |||
| Core | CUDA cores | 2,560 | 3,328 | 4,608 | 5,888 | 7,680 | 10,496 |
| Texture mapping unit | 80 | 104 | 144 | 184 | 240 | 328 | |
| Render output unit | 32 | 48 | 80 | 96 | 112 | ||
| Ray tracing cores | 20 | 26 | 36 | 46 | 60 | 82 | |
| Tensor cores | 80 | 104 | 144 | 184 | 240 | 328 | |
| Clock speed (GHz) Boost value (GHz) |
1.02–2.31 1.50–2.55 |
0.95–1.95 1.45–2.31 |
0.90–1.83 1.42–2.21 |
0.85–1.98 1.45–2.47 |
0.98–1.80 1.50–2.28 |
0.99–2.28 1.51–2.52 | |
| Streaming multiprocessors | 20 | 26 | 36 | 46 | 60 | 82 | |
| Cache | L1 | 2.5 MB | 3.25 MB | 4.5 MB | 5.75 MB | 7.5 MB | 10.5 MB |
| L2 | 32 MB | 48 MB | 64 MB | ||||
| Memory | Type | GDDR7 | |||||
| Size | 8 GB | 8 GB 12 GB55 |
12 GB | 16 GB | 24 GB | ||
| Clock (Gb/s) | 24 | 28 | |||||
| Bandwidth (GB/s) | 384 | 672 | 896 | ||||
| Bus width | 128-bit | 192-bit | 256-bit | ||||
| Fillrate | Pixel (Gpx/s)a | 48.0–81.6 | 69.8–110.9 | 68.4–106.2 | 115.8–198.0 | 144–219.5 | 169.7–282.2 |
| Texture (Gtex/s)b | 120.0–204.0 | 151.3–240.2 | 205.2–318.5 | 266.2–455.4 | 360–548.8 | 496.9–826.5 | |
| Processing power (TFLOPS) |
FP16/FP32 | 7.68–13.05 | 9.68–15.38 | 13.13–20.39 | 17.04–29.14 | 23.04–35.13 | 31.80–52.90 |
| FP64 | 0.12–0.20 | 0.15–0.24 | 0.20–0.32 | 0.27–0.45 | 0.36–0.54 | 0.49–0.82 | |
| Tensor compute [sparse] |
|||||||
| Interface | Host | PCIe 5.0 x16 | |||||
| TDP | 50–100 W | 45–100 W | 50–100 W | 60–115 W | 80–150 W | 95–150 W | |
- Pixel fillrate is calculated as the number of render output units (ROPs) multiplied by the base (or boost) core clock speed.
- Texture fillrate is calculated as the number of texture mapping units (TMUs) multiplied by the base (or boost) core clock speed.
Controversies
12V-2x6 power connector issue
The 12V-2x6 connector used by multiple 5090 cards faces criticism due to a design flaw that can potentially cause the connector to melt. The flaw primarily affect Nvidia's own RTX 5090 FE565758 and RTX 5080 FE cards and are similar to the failures seen on the RTX 40 series but models by third party OEMs have been affected as well.
Availability and pricing
The releases of the RTX 5090, 5080 and 5070 Ti were marked by severe availability issues and pricing well above MSRP.5960616263 Pricing became an issue again at the end of 2025 due to an ongoing memory supply shortage.6465 Nvidia has been rumored to cut production of 16GB VRAM cards, affecting the availability of the RTX 5060 Ti 16GB and RTX 5070 Ti SKUs.
32-bit support removal for CUDA, OpenCL, and GPU PhysX
Support for 32-bit OpenCL, and CUDA applications (and as a result 32-bit GPU-accelerated PhysX), was dropped for the GeForce RTX 50 series, which resulted in several applications encountering performance issues with GPU PhysX options or not being able to run at all, causing negative reactions from numerous gaming communities.66676869
On December 4, 2025, with the release of driver version 591.44, 32-bit GPU-accelerated PhysX support was restored for certain games. Support for more games was promised in the future.70
Incomplete dies and missing ROPs
The dies of certain RTX 5090/5090D, 5080, and 5070 Ti cards were missing eight render output units (ROPs), resulting in slower graphics while pure compute and AI workloads are unaffected.7172 Nvidia claimed that less than 0.5% of cards are affected and that the "production anomaly" has been rectified.7374
Black screen issues
Some RTX 5080 and 5090 users reported an issue where the system would boot into a black screen after installing Nvidia drivers. Nvidia confirmed the issue and said that a new driver update would fix it for people who hadn't received a VBIOS update yet.75 Released on February 27, 2025 Nvidia drivers version 572.60 claim to have fixed the issue.7677 Nvidia has since released multiple hotfix and Game Ready drivers that contain additional fixes for the issue.7879
Windows driver branch quality and stability
Users and media outlets have complained about the quality and stability of the 572.XX and 576.XX Windows driver branch (that was released for the RTX 50 series), also affecting previous generation Nvidia GPUs, including RTX 30 and RTX 40 series.80818283848586 Issues include BSODs, graphical corruptions and game specific problems.
RTX 5060 Ti 8GB and RTX 5060 review restrictions
Nvidia decided not to supply reviewers with advance copies of RTX 5060 Ti 8GB cards and prevented certain partners from doing so. It also delayed reviews of the RTX 5060 as the review embargo was lifted on April 16, 2025, before reviewers could acquire the cards officially.87888990 Nvidia chose not to offer samples of the RTX 5050.9192
DLSS 4 Multi Frame Generation (MFG) criticism
Several technology journalists have been critical of Nvidia's performance claims relating to GeForce RTX 50 graphics cards, as Nvidia published benchmarks using MFG to show significant increases in FPS over their previous generation.9394 Additional concerns were uttered about image quality, the increase in input latency and general usability.95
Nvidia claims that the RTX 5070 is as fast as the RTX 4090,969798 but this is untrue except the extreme scenario of 4x DLSS 4 Multi Frame generation and the lowest quality DLSS preset. This combination results in noticeable visual artefacts that are exacerbated if the base frame rate is too low; this is said to be between 40 and 60 fps by several reviewers. Additionally, while it may improve perceived frame rate through frame smoothing, it increases input latency and is thus unsuitable for latency-sensitive games such as competitive shooters, fighting games and virtual reality games.
Nvidia also claims that the RTX 5060 Ti is up to 50 times faster than the GTX 1060,99 a GPU released 9 years prior and with a significantly lower MSRP than the 5060 Ti. These performance claims appear to be based on the 1060's lack of support for hardware ray tracing, DLSS Super Sampling, and Multi Frame Generation; as such, they are of little relevance when evaluating the gaming performance of the 5060 Ti.100
Reception
RTX 5090

The RTX 5090 received a generally lukewarm reception,101102103104 citing its overreliance on AI to find its value, the card requiring 125W more than the RTX 4090 (which is rated at 450W), and being significantly more expensive at $1999 than the RTX 4090, which had an MSRP of $1599.105 Many reviewers called the RTX 50 series marketing deceitful, considering that DLSS 4's Multi Frame Generation cannot make unplayable games playable, and cannot improve latency. Some reviewers even jokingly referred to it as the "RTX 4090 Ti".106
RTX 5080
Antony Leather from Forbes described the RTX 5080 as "a decent upgrade from anything below or older than the RTX 4080 Super and 4080".107 Nonetheless, he criticized that "there's only a 10% uplift over the RTX 4080 Super" in raw performance, with the RTX 4090 still being "quite a bit faster" without Multi Frame Generation, while the RTX 5080 only just overtakes the RTX 4090 with Multi Frame Generation enabled.107
Andrew Cunningham from Ars Technica stated that the RTX 5080 "is the third-fastest GPU on the market [behind the RTX 5090 and RTX 4090], but it's far short of the 4090, and it performs more like a second refresh of 2022's RTX 4080".108 He praised the RTX 5080's MSRP of US$999 and described it as a "good 4K card", but called it "[b]arely an upgrade over the RTX 4080 Super".108
IGN praised the RTX 5080's overall performance, modest increase in power demand over its predecessor, and MSRP, though noted that "[i]t's [...] not quite the performance uplift that hardcore enthusiasts who upgrade every generation are going to want to see".109 Also, while the 16 GB of VRAM "should be enough memory for most people", "it would have been nice to see the RTX 5080 adopt the 24GB featured on the RTX 4090, especially since this GPU is being pitched as a 4K graphics card".109
RTX 5070 Ti
The RTX 5070 Ti had a lukewarm reception just like the RTX 5090 and RTX 5080. While it was generally praised for its competitive performance at 1440P and 4K resolutions relative to previous generation graphics cards, it also received criticism, most commonly for the card normally only being available at $900 or above, despite Nvidia's listed MSRP of $750.110
Andrew Cunningham from Ars Technica called the RTX 5070 Ti "essentially an RTX 4080 that also supports DLSS Multi-Frame Generation". While the card was praised for its excellent overall performance and being capable of 4K gaming, it was criticized for its poor price-to-performance and mediocre performance uplift.111 TechPowerUp's review of the RTX 5070 Ti found large performance gains relative to the RTX 4070 Ti, praising its performance relative to AMD's at-the-time flagship RX 7900 XTX, the new DLSS 4 Frame Generation technology, and its efficiency and performance, although it did also receive criticism for its inflated MSRP.112 IGN praised the performance of the RTX 5070 Ti and its value relative to the RTX 5090 and RTX 5080, stating "Not only is it the first RTX 5000 graphics card that provides a decent uplift over its predecessor, but it does so with a lower price tag than the $799 RTX 4070 Ti".113
RTX 5070
The RTX 5070 received criticism for its poor value, offering only a marginal performance increase over the previous generation's RTX 4070 Super, with performance sometimes even trailing its predecessor. The card is a decent option for 1440p gaming, but Multi-Frame Generation introduces a responsiveness trade-off, and the limited 12GB of VRAM is seen as insufficient for the price, making it a difficult sell compared to the 4070 Super.114115116117 Despite this, as of August 2025 the 5070 became the most popular current-gen GPU on Steam's hardware survey.118
RTX 5060 Ti
The RTX 5060 Ti received moderate praise for its performance uplift over older RTX 4060 Ti and 3060 Ti cards,119120 although much attention was brought to the 8GB version's low VRAM capacity. According to Tom's Hardware, the 8GB version was unable to perform well at higher resolutions.121
The $50 price difference between the 5060 Ti 8GB and 16GB versions, in contrast to the previous generation $100 difference between the RTX 4060 Ti 8GB and 16GB, led to a general preference for the 5060 Ti 16GB, although much like the other RTX 50 Series cards, the 5060 Ti suffered pricing much higher than MSRP. TechPowerUp's review of the card noted that "On paper, the 8 GB variant is supposed to be priced at $380, and the 16 GB variant at $430, but we now know that these prices are pure fiction. The RTX 5060 Ti 16 GB is realistically available from $500 mark, $70 higher than Nvidia's starting price; while the RTX 5060 Ti 8 GB is priced closer to its natural MSRP".122
RTX 5060
Like the 5060 Ti 8GB, the RTX 5060 is, according to TechSpot, limited by its 8GB VRAM capacity. TechSpot's review stated that "It's frustrating how good the RTX 5060 could have been. Even with just 12 GB of VRAM, we might have been able to tentatively recommend it at its current price. With 16 GB, it could have been a genuinely solid product".123
James Archer from Rock Paper Shotgun described the RTX 5060 as an affordable option for 1080p, but "not equipped" for 1440p,124 while Jacob Roach from XDA cited Intel's Arc B580 as "the one card that really kills the credibility of the RTX 5060", with its 12GB VRAM capacity. This despite the Arc B580 costing around $320 compared to the RTX 5060's $300 MSRP.125
RTX 5050
As with the RTX 5060, the RTX 5050 received some praise as an affordable option for gaming at 1080p but received criticism for its limited 8GB VRAM capacity.126127128129
See also
See also
- Arc B-Series – competing Intel GPU generation released in a similar time-frame
- Radeon RX 9000 series – competing AMD GPU generation released in a similar time-frame
References
References
- "NVIDIA RTX BLACKWELL GPU ARCHITECTURE" (PDF). NVIDIA. Retrieved February 2, 2025.
- "OpenGL Driver Support | NVIDIA Developer". developer.nvidia.com. NVIDIA. Retrieved July 21, 2025.
- "Vulkan Driver Support | NVIDIA Developer". Nvidia Developer. Retrieved July 21, 2025.
- Chacos, Brad (December 13, 2024). "Nvidia stokes RTX 50-series hype with Witcher 4 and a global LAN party". PCWorld. Retrieved January 6, 2025.
- Nasir, Hassan (December 13, 2024). "Nvidia teases RTX 50 Blackwell Gaming GPUs for launch next month — The Witcher IV's first cinematic trailer likely leveraged the upcoming RTX 5090". Tom's Hardware. Retrieved January 6, 2025.
- Bailey, Dustin (January 7, 2025). "The Witcher 4's gorgeous reveal trailer was "pre-rendered" on Nvidia's $2,000 RTX 5090". GamesRadar+. Retrieved January 9, 2025.
- Garreffa, Anthony (December 26, 2024). "AMD and Nvidia ship next-gen gaming GPUs from China to US before Jan 20 to escape tariffs". TweakTown. Retrieved January 6, 2025.
- Zuhair, Muhammad (December 26, 2024). "Nvidia & AMD Rush To Ship Out Next-Gen GPUs To Avoid Trump Tariffs; GeForce RTX 5090 Estimated To Cost $2,500+". Wccftech. Retrieved January 6, 2025.
- Arantani, Lauren (October 15, 2024). "Trump vows to impose tariffs as experts warn of price hikes and angry allies". The Guardian. Retrieved January 6, 2025.
Trump is proposing an at least 10% blanket tariff on all imports, with tariffs as high as 60% on goods from China.
- Chu, Ben (October 15, 2024). "Would Donald Trump's tariffs hurt US consumers?". BBC News. Retrieved January 6, 2025.
- Warren, Tom (January 6, 2025). "Nvidia announces next-gen RTX 5090 and RTX 5080 GPUs". The Verge. Retrieved January 6, 2025.
- Chacos, Brad (January 6, 2025). "Surprise! Nvidia's GeForce RTX 50-series GPUs cost less than you thought". PCWorld. Retrieved January 7, 2025.
- "Nvidia RTX 5070 Reviews Debunk "RTX 4090 Performance at $549" Claim - 9meters". March 4, 2025.
- "Nvidia GeForce RTX 5070 review: No, it's not "4090 performance at $549"". March 4, 2025.
- James, Dave (January 6, 2025). "Nvidia's new RTX 5070 will deliver 'RTX 4090 performance at $549' when it launches in February". PC Gamer. Retrieved January 7, 2025.
- "NVIDIA Blackwell Architecture". NVIDIA. Retrieved January 11, 2025.
- "Nvidia reportedly prioritizes Samsung GDDR7 memory for desktop GeForce RTX 50 series". VideoCardz. November 25, 2024. Retrieved January 6, 2025.
- Mujtaba, Hassan (November 25, 2024). "Nvidia GeForce RTX 50 "Blackwell" GPUs Reportedly Utilize Samsung's GDDR7 Memory Chips". Wccftech. Retrieved January 6, 2025.
- Mah Ung, Gordon (June 15, 2023). "Melting GeForce RTX 4090 power cables: A timeline of events". PCWorld. Retrieved January 6, 2025.
- Liu, Zhiye (July 3, 2023). "16-Pin Power Connector Gets A Much-Needed Revision, Meet The New 12V-2x6 Connector". Tom's Hardware. Retrieved January 6, 2025.
- Campbell, Mark (February 19, 2024). "Nvidia to mandate 16-pin PCIe 6.0 power with RTX 50 series "Blackwell" GPUs". OC3D. Retrieved January 6, 2025.
- Leadbetter, Richard (January 7, 2025). "Hands-on with DLSS 4 on Nvidia's new GeForce RTX 5080". Eurogamer. Retrieved January 7, 2025.
- Lin, Henry; Burnes, Andrew (January 6, 2025). "Nvidia DLSS 4 Introduces Multi Frame Generation & Enhancements For All DLSS Technologies". Nvidia. Retrieved January 7, 2025.
- Mujtaba, Hassan (January 6, 2025). "Nvidia DLSS 4 Delivers An Insane 8x Performance Boost Versus DLSS 3 With Multi Frame Generation Technology, Enhanced Upscaling For RTX 20 & Above". Wccftech. Retrieved January 7, 2025.
- "Karty graficzne NVIDIA GeForce RTX z serii 50". NVIDIA (in Polish). Retrieved July 18, 2025.
- Garreffa, Anthony (January 6, 2025). "Nvidia GeForce RTX 50 'Blackwell' GPU support DisplayPort 2.1b UHBR20, up to insane 8K 165Hz". TweakTown. Retrieved January 9, 2025.
- "VESA to Update DisplayPort 2.1 with New Active Cable Specification for Up to 3x Longer DP80 Cables". VESA (Press release). January 6, 2025. Retrieved January 6, 2025.
- "Nvidia GeForce RTX 50 series adds support for 4:2:2 color format video decoding and encoding". VideoCardz. January 8, 2025. Retrieved January 9, 2025.
- Liu, Zhiye (February 4, 2023). "Chinese-Made PCIe 5.0 Gaming GPU Benchmarks Emerge (Updated)". Tom's Hardware. Retrieved January 11, 2025.
- Mujtaba, Hassan (January 8, 2025). "NVIDIA GeForce RTX 5080 Uses 30 Gbps GDDR7 Memory Dies From Multiple Partners Starting With Samsung". Wccftech. Retrieved January 11, 2025.
- Walton, Jarred (August 9, 2024). "Nvidia Blackwell and GeForce RTX 50-Series GPUs: Specifications, release dates, pricing, and everything we know (updated)". Tom's Hardware. Retrieved February 13, 2025.
- "TSMC Expands Advanced Technology Leadership with N4P Process". October 26, 2021.
- "NVIDIA GeForce RTX 5050 Specs". TechPowerUp. June 24, 2025. Retrieved June 24, 2025.
- "Compare GeForce Graphics Cards". Nvidia. Retrieved April 16, 2026.
- "NVIDIA GeForce RTX 5060 Specs". TechPowerUp. April 16, 2025. Retrieved April 28, 2025.
- "Compare GeForce Graphics Cards". Nvidia. Retrieved April 16, 2026.
- "NVIDIA GeForce RTX 5060 Ti Specs". TechPowerUp. April 16, 2025. Retrieved April 28, 2025.
- "Compare GeForce Graphics Cards". Nvidia. Retrieved April 16, 2026.
- Nvidia (February 6, 2025). "APPENDIX C: Blackwell GB205 GPU - GeForce RTX 5070 Specifications" (PDF). NVIDIA RTX Blackwell GPU Architecture (PDF). v1.01. Retrieved April 28, 2025.
- Nvidia (February 6, 2025). "APPENDIX B: Blackwell GB203 GPU - GeForce RTX 5070 Ti Specifications" (PDF). NVIDIA RTX Blackwell GPU Architecture (PDF). v1.01. Retrieved April 28, 2025.
- Nvidia (February 6, 2025). "APPENDIX B: Blackwell GB203 GPU - GeForce RTX 5080 Specifications" (PDF). NVIDIA RTX Blackwell GPU Architecture (PDF). v1.01. Retrieved April 28, 2025.
- Nvidia (February 6, 2025). "APPENDIX A: Blackwell GB202 GPU - GeForce RTX 5090 Specifications" (PDF). NVIDIA RTX Blackwell GPU Architecture (PDF). v1.01. Retrieved April 28, 2025.
- Khan, Safraz (January 7, 2025). "MSI Launches GeForce RTX 50-Series Gaming Laptops: RTX 5090-Powered Titan 18 HX Dragon Edition Aimed For Elite Performance". Wccftech. Retrieved January 9, 2025.
- "Gigabyte Shows Off Custom GeForce RTX 50 Series Designs for Desktop, and Blackwell-Powered Laptops". TechPowerUp. January 7, 2025. Retrieved January 9, 2025.
- Burnes, Andrew (January 6, 2025). "New GeForce RTX 50 Series Graphics Cards & Laptops Powered By Nvidia Blackwell Bring Game-Changing AI and Neural Rendering Capabilities To Gamers and Creators". Nvidia. Retrieved January 9, 2025.
- Nasir, Hassam (January 7, 2025). "Nvidia introduces RTX 5090, RTX 5080, and RTX 5070 laptop GPUs — RTX 50 Blackwell goes mobile with up to 24GB of GDDR7 memory". Tom's Hardware. Retrieved January 9, 2025.
- Osborne, Joe (January 7, 2025). "Nvidia GeForce RTX 50-Series Mobile GPUs Bring AI-Based Rocket Fuel to Gaming Laptops This Spring". PCMag UK. Retrieved January 9, 2025.
- "NVIDIA GeForce RTX 5050 Mobile Specs". TechPowerUp. June 24, 2025. Retrieved June 24, 2025.
- "NVIDIA GeForce RTX 5060 Mobile Specs". TechPowerUp. April 21, 2025. Retrieved April 21, 2025.
- "NVIDIA GeForce RTX 5070 Mobile Specs". TechPowerUp. January 11, 2025. Retrieved January 11, 2025.
- "NVIDIA GeForce RTX 5070 Ti Mobile Specs". TechPowerUp. January 11, 2025. Retrieved January 11, 2025.
- "NVIDIA GeForce RTX 5080 Mobile Specs". TechPowerUp. January 11, 2025. Retrieved January 11, 2025.
- "NVIDIA GeForce RTX 5090 Mobile Specs". TechPowerUp. January 11, 2025. Retrieved January 11, 2025.
- "NVIDIA GeForce RTX 5090 - Specifications and Benchmark - SocSpecifications". Retrieved January 31, 2025.
- published, Aaron Klotz (April 28, 2026). "Nvidia quietly launches 12GB RTX 5070 laptop GPU — midrange mobile gaming gets more VRAM amid the RAMpocalypse". Tom's Hardware. Retrieved May 28, 2026.
- "Der8auer shows GeForce RTX 5090 FE cables with uneven power distribution, finds 150 °C hotspot". VideoCardz.com. Retrieved February 12, 2025.
- "RTX Cablegate update: GeForce RTX 5090 claims another 3rd party cable, MODDIY now recommends to upgrade to newer 12V-2x6 cables". VideoCardz.com. Retrieved February 12, 2025.
- Nasir, Hassam (February 11, 2025). "RTX 5090 cable overheats to 150 degrees Celsius — Uneven current distribution likely the culprit". Tom's Hardware. Retrieved February 12, 2025.
- Darragh, Murphy (February 3, 2025). "Nvidia RTX 5090 and RTX 5080 stock update: UK retailer warns 4-month wait". Tom's Guide. Retrieved February 16, 2025.
- Ahmed, Sayem (January 28, 2025). "Nvidia Issues RTX 5090 and 5080 Stock Shortage Warning to PC Gamers Ahead of Hotly Anticipated Release Date". IGN. Retrieved February 16, 2025.
- WhyCry (February 5, 2025). "MSI and ASUS hike GeForce RTX 50 series prices in official stores, now up to $3,409 for RTX 5090". VideoCardz.com. Retrieved February 16, 2025.
- Morales, Jowi (February 8, 2025). "Newegg blames tariffs for RTX 5090 and RTX 5080 price hikes, but then walks it back". Tom's Hardware. Retrieved February 16, 2025.
- "GeForce RTX 5070 Ti launch shows very few MSRP models and fake promotions". VideoCardz.com. Retrieved February 20, 2025.
- "PC gamers, don't panic yet, but I think we might be cooked – Nvidia RTX 5000 GPU shortages could happen due to RAM crisis". TechRadar. January 5, 2026. Retrieved February 5, 2026.
- updated, Stewart Bendle last (January 23, 2026). "GPU price tracking 2026: Lowest price on every graphics card from Nvidia, AMD, and Intel today — here are the best deals during the AI-driven pricing crisis". Tom's Hardware. Retrieved February 5, 2026.
{{cite web}}:|last=has generic name (help) - Papadopoulos, John (February 18, 2025). "NVIDIA RTX50 series doesn't support GPU PhysX for 32-bit games". DSOGaming. Retrieved February 18, 2025.
- "NVIDIA ends CUDA 32-bit support for GeForce RTX 50 series, impacting PhysX in older games". VideoCardz.com. Retrieved February 18, 2025.
- "PhysX quietly retired on RTX 50 series GPUs: Nvidia ends 32-bit CUDA app support". Tom's Hardware. February 18, 2025. Retrieved February 21, 2025.
- Deakin, Daniel R (February 26, 2025). "Strange GeForce RTX 50-series benchmark issues solved but new problem for gamers arises". Notebookcheck. Retrieved February 26, 2025.
- "Battlefield 6: Winter Offensive GeForce Game Ready Driver Released". NVIDIA. Retrieved December 4, 2025.
- btarunr (February 21, 2025). "NVIDIA GeForce RTX 5090 Spotted with Missing ROPs, Performance Loss Confirmed, Multiple Vendors Affected". TechPowerUp. Retrieved February 21, 2025.
- Davis, Wes (February 24, 2025). "RTX 5080s are missing ROPs, too". The Verge. Retrieved February 24, 2025.
- Hollister, Sean (February 22, 2025). "Nvidia confirms 'rare' RTX 5090 and 5070 Ti manufacturing issue". The Verge. Retrieved February 22, 2025.
- Hollister, Sean (February 25, 2025). "Nvidia admits some early RTX 5080 cards are missing ROPs, too". The Verge. Retrieved February 25, 2025.
- WhyCry (February 26, 2025). "NVIDIA confirms fix for GeForce RTX black screen issues: VBIOS and new driver coming this week". VideoCardz.com. Retrieved February 26, 2025.
- "Driver Details". NVIDIA. Retrieved March 1, 2025.
- WhyCry. "NVIDIA releases GPU driver fixing several black screen issues on GeForce RTX 50 series". VideoCardz.com. Retrieved March 1, 2025.
- btarunr (April 16, 2025). "NVIDIA Releases the GeForce 576.02 WHQL Game Ready Drivers". TechPowerUp. Retrieved April 16, 2025.
- btarunr (April 22, 2025). "NVIDIA Releases GeForce Hotfix Driver 576.15". TechPowerUp. Retrieved April 23, 2025.
- Nasir, Hassam (March 23, 2025). "RTX 40 GPU owners suffering from BSODs and crashes complain about Nvidia's RTX 50 focus". Tom's Hardware. Retrieved April 4, 2025.
- eriHwBusters (March 31, 2025). "Game Developers Advise Against Installing NVIDIA Driver 572.XX for RTX 40 and RTX 30 Series Due to Stability Issues". Hardware Busters. Retrieved April 4, 2025.
- DF Clips (April 2, 2025). Nvidia Driver Issues Can't Be Ignored: The 'Bullet-Proof' Reputation Is Taking A Battering. Retrieved April 4, 2025 – via YouTube.
- Khullar, Kunal (March 31, 2025). "Game developers urge Nvidia RTX 30 and 40 series owners rollback to December 2024 driver after recent RTX 50-centric release issues". Tom's Hardware. Retrieved April 4, 2025.
- Khan, Sarfraz (March 30, 2025). "Game Developers Are Discouraging Users From Installing NVIDIA Driver 572.XX For RTX 40 And RTX 30 Series GPUs Due To Instability". Wccftech. Retrieved April 4, 2025.
- WhyCry; SMiThaYe. "Multiple GeForce GPU driver issues replicated - Gamers Nexus: "this is the worst launch I've ever seen for NVIDIA"". VideoCardz.com. Retrieved April 7, 2025.
- Warren, Tom (April 22, 2025). "Nvidia's GPU drivers are a mess". The Verge. Vox Media. Retrieved April 24, 2025.
- "NVIDIA doesn't want GeForce RTX 5060 (Ti) 8GB reviews". VideoCardz.com. Retrieved April 15, 2025.
- Hardware Unboxed (April 15, 2025). Nvidia Try to Hide the RTX 5060 8GB. Retrieved April 15, 2025 – via YouTube.
- Linus Tech Tips (April 15, 2025). I Can't Review GPUs that Don't Exist... RTX 5060 and 5060 Ti. Retrieved April 16, 2025 – via YouTube.
- Hollister, Sean (May 22, 2025). "Nvidia's RTX 5060 review debacle should be a wake-up call for gamers and reviewers". The Verge. Vox Media. Retrieved May 23, 2025.
- Jon Martindale (July 3, 2025). "After another review-less launch, the first RTX 5050 benchmarks are here — Nvidia's budget card loses to B580 and RTX 4060, with only multi frame generation to give it a boost". Tom's Hardware. Retrieved July 7, 2025.
- "Nvidia Drops the RTX 5050 With No Reviews, But We Have Performance Numbers Anyway". Yahoo Tech. July 1, 2025. Retrieved July 7, 2025.
- "NVIDIA is Selling Lies | RTX 5070 Founders Edition Review & Benchmarks | GamersNexus". gamersnexus.net. March 13, 2025. Retrieved April 15, 2025.
- "Nvidia Slammed For 'Lying' About Budget Graphics Card But They're Selling Out Anyway". Kotaku. March 6, 2025. Retrieved April 15, 2025.
- "A Review of Nvidia's DLSS 4 Multi Frame Generation". techspot.com. January 28, 2025. Retrieved July 21, 2025.
- Warren, Tom (January 8, 2025). "Can Nvidia's RTX 5070 really deliver RTX 4090 performance for $549?". The Verge. Retrieved November 20, 2025.
- Dave James (January 7, 2025). "Nvidia's new RTX 5070 will deliver 'RTX 4090 performance at $549' when it launches in February". PC Gamer. Retrieved November 20, 2025.
- Foundry, Digital (January 13, 2025). "DF Weekly: can the new RTX 5070 really match RTX 4090 performance?". Digital Foundry. Retrieved November 20, 2025.
- "More Marketing BS: NVIDIA GeForce RTX 5060 Ti Review & Benchmarks vs GTX 1060, 4060 Ti, & More | GamersNexus". gamersnexus.net. April 17, 2025. Retrieved November 20, 2025.
- Goodall, Jack (April 15, 2025). "RTX 5060 Ti is for gamers still using a GTX card, "mind-blowing upgrade" 50x faster than 1060, claims Nvidia". PC Guide. Retrieved April 15, 2025.
- Walton, Jarred (January 23, 2025). "Nvidia GeForce RTX 5090 Founders Edition review: Blackwell commences its reign with a few stumbles". Tom's Hardware. Retrieved January 25, 2025.
- Cunningham, Andrew (January 24, 2025). "Nvidia GeForce RTX 5090 costs as much as a whole gaming PC—but it sure is fast". Ars Technica. Retrieved January 25, 2025.
- "NVIDIA GeForce RTX 5090 review: Pure AI excess for $2,000". Engadget. January 23, 2025. Retrieved January 25, 2025.
- Thomas, Jacqueline (January 23, 2025). "Nvidia GeForce RTX 5090 Founders Edition Review". IGN. Retrieved January 25, 2025.
- "Nvidia GeForce RTX 5090 costs as much as a whole gaming PC—but it sure is fast". Ars Technica. January 24, 2025. Retrieved February 21, 2025.
- Walton, Steven (January 23, 2025). "Nvidia GeForce RTX 5090 Review". TechSpot. Retrieved January 25, 2025.
- Leather, Antony. "Nvidia GeForce RTX 5080 Vs RTX 4090: And The Winner Is?". Forbes. Retrieved January 29, 2025.
- Cunningham, Andrew (January 29, 2025). "Nvidia GeForce RTX 5080 review: More like a 4080 Super Super". Ars Technica. Retrieved January 29, 2025.
- Thomas, Jacqueline (January 29, 2025). "Nvidia GeForce RTX 5080 Review". IGN. Retrieved January 29, 2025.
- Walton, Jarred (February 20, 2025). "Nvidia GeForce RTX 5070 Ti review: A proper high-end GPU, if you can find it at MSRP". Tom's Hardware. Retrieved February 23, 2025.
- Cunningham, Andrew (February 21, 2025). "Nvidia GeForce RTX 5070 Ti review: An RTX 4080 for $749, at least in theory". Ars Technica. Retrieved February 23, 2025.
- W1zzard (February 20, 2025). "MSI GeForce RTX 5070 Ti Vanguard SOC Review". TechPowerUp. Retrieved February 23, 2025.
{{cite web}}: CS1 maint: numeric names: authors list (link) - Thomas, Jacqueline (February 20, 2025). "Nvidia GeForce RTX 5070 Ti Review". IGN. Retrieved February 23, 2025.
- Loeffler, John (March 4, 2025). "I really wanted to like the Nvidia GeForce RTX 5070, but it broke my heart and it shouldn't have to break yours, too". TechRadar. Retrieved March 4, 2025.
- Walton, Steven (March 4, 2025). "Nvidia GeForce RTX 5070 Review". TechSpot. Retrieved March 4, 2025.
- Cunningham, Andrew (March 4, 2025). "Nvidia GeForce RTX 5070 review: No, it's not "4090 performance at $549"". Ars Technica. Retrieved March 4, 2025.
- Archer, James (March 7, 2025). "Nvidia GeForce RTX 5070 review: an RTX 4070 Super with a DLSS 4 badge". Rock Paper Shotgun. Retrieved March 7, 2025.
- Laird, Jeremy (September 2, 2025). "Nvidia's RTX 5070 is the most popular current-gen GPU in the latest Steam hardware survey but AMD's RDNA 4 cards don't even make the top 100". PCGamer. Retrieved September 9, 2025.
- Thomas, Jacqueline (April 22, 2025). "Nvidia GeForce RTX 5060 Ti Review". IGN. Retrieved June 22, 2025.
- "More Marketing BS: NVIDIA GeForce RTX 5060 Ti Review & Benchmarks vs GTX 1060, 4060 Ti, & More | GamersNexus". gamersnexus.net. April 17, 2025. Retrieved June 22, 2025.
- Jarred Walton (April 16, 2025). "Nvidia GeForce RTX 5060 Ti 16GB review: More VRAM and a price 'paper cut' could make for a compelling GPU". Tom's Hardware. Retrieved June 22, 2025.
- W1zzard; on; NVIDIA, in Graphics Cards Manufacturer (April 22, 2025). "NVIDIA GeForce RTX 5060 Ti 8 GB Review - So Many Compromises". TechPowerUp. Retrieved June 22, 2025.
{{cite web}}: CS1 maint: numeric names: authors list (link) - "Nvidia GeForce RTX 5060 Review: They Didn't Want This Out". TechSpot. May 22, 2025. Retrieved June 22, 2025.
- Archer, James (April 16, 2025). "Nvidia GeForce RTX 5060 Ti 16GB review: an all-rounder that's better all round". Rock, Paper, Shotgun. Retrieved June 22, 2025.
- Roach, Jacob (May 30, 2025). "Nvidia's RTX 5060 already feels out of date". XDA. Retrieved June 22, 2025.
- Martindale, Jon (July 3, 2025). "After another review-less launch, the first RTX 5050 benchmarks are here — Nvidia's budget card loses to B580 and RTX 4060, with only multi frame generation to give it a boost". Tom's Hardware. Retrieved July 3, 2025.
- Walton, Steven (July 7, 2025). "Nvidia GeForce RTX 5050 Review". TechSpot. Retrieved July 7, 2025.
- Archer, James (July 30, 2025). "Nvidia GeForce RTX 5050 review: Starting, and finishing, at the bottom". Rock Paper Shotgun. Retrieved July 30, 2025.
- Sexton, Michael (August 8, 2025). "Nvidia GeForce RTX 5050 Review: Not Enough Punch for the Price". PCMag. Retrieved August 8, 2025.
External links
External links
- Official website
- Media related to Nvidia GeForce 50 series video cards at Wikimedia Commons